Petts Wood
PETLondonManaged by Southeastern
How this station is performing
Petts Wood had 101,404 scheduled stops to Period 7 of 2026-27, about 279 a day. 84.2% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Petts Wood opened on 9 July 1928, 98 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Petts Wood is the newest; the oldest, Bickley, opened in 1858.
The nearest stations to Petts Wood are Orpington (2.0 km south-east), Chislehurst (2.2 km north-west), St Mary Cray (2.3 km east), Bickley (2.5 km north-west) and Elmstead Woods (3.8 km north-west). 47 stations lie within 10 km in all. Of the five, Chislehurst is the most punctual at 91.0% and Orpington the least at 80.2%, with Petts Wood on 84.2%.
Petts Wood takes its name from an area of London called Petts Wood, home to about 13,651 people, and the station stands 0.1 km from its centre.
2 operators call at Petts Wood: Southeastern (84.2%, 92% of stops) and GTR (84.3%, 8% of stops). They are close together, with GTR leading on 84.3% and Southeastern trailing on 84.2%, a gap of 0.1 percentage points.
Compared with 3 stations of a similar size in London, Petts Wood is the most punctual, at 84.2%. The comparison group includes Hampstead Heath (77.5%), Brondesbury (77.8%) and Kensal Rise (78.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 93,682 | 84.2% | 1.5% |
| GTR | 7,722 | 84.3% | 5.8% |
Operators with their own page for this station are linked to it.
Late train at Petts Wood? Delay Repay
These operators call at Petts Wood and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,920 | 83.0% | 1.2% |
| Period 6 of 2026-27 | 7,993 | 81.9% | 2.1% |
| Period 5 of 2026-27 | 6,881 | 83.5% | 2.4% |
| Period 4 of 2026-27 | 7,839 | 84.9% | 1.8% |
| Period 3 of 2026-27 | 7,923 | 83.1% | 3.0% |
| Period 2 of 2026-27 | 7,494 | 86.3% | 2.5% |
| Period 1 of 2026-27 | 9,029 | 89.6% | 0.9% |
| Period 13 of 2025-26 | 8,687 | 87.5% | 1.3% |
| Period 12 of 2025-26 | 7,903 | 86.0% | 1.1% |
| Period 11 of 2025-26 | 7,834 | 84.3% | 1.3% |
| Period 10 of 2025-26 | 6,136 | 83.3% | 3.3% |
| Period 9 of 2025-26 | 7,951 | 80.1% | 2.2% |
| Period 8 of 2025-26 | 7,814 | 79.7% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hampstead Heath | 101,751 | 77.5% | 8.2% |
| Brondesbury | 101,752 | 77.8% | 7.9% |
| Kensal Rise | 101,752 | 78.0% | 8.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out