Southeastern at Petts Wood
How this operator is doing here
Southeastern had 93,682 scheduled stops at Petts Wood in the 13 periods to Period 7 of 2026-27, 92% of the station's total. 84.2% of recorded arrivals came within three minutes and 1.5% of stops were cancelled.
Southeastern trains at Petts Wood also serve Orpington (2.0 km south-east, 80.1% on time, 1.7% cancelled), Chislehurst (2.2 km north-west, 91.0% on time, 1.2% cancelled), St Mary Cray (2.3 km east, 81.7% on time, 1.3% cancelled), Bickley (2.5 km north-west, 84.6% on time, 2.0% cancelled), Elmstead Woods (3.8 km north-west, 90.8% on time, 1.2% cancelled) and Bromley South (4.1 km west, 80.6% on time, 1.6% cancelled), which are the stations on its network closest to Petts Wood.
Within 30 km of here, Southeastern runs best at Sundridge Park, 4.6 km north-west (99.4%), and worst at Hildenborough, 22.1 km south-east (70.3%).
The busiest Southeastern station within 30 km of Petts Wood is London Bridge, 17.0 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Petts Wood, Southeastern is the least punctual, at 84.2%.
For Southeastern, Petts Wood ranks 77th of 173 stations and is typical: 84.2% here against 84.2% across the network, a difference of 0.0 percentage points.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,279 | 82.9% | 1.0% |
| Period 6 of 2026-27 | 7,314 | 81.6% | 1.7% |
| Period 5 of 2026-27 | 6,313 | 83.7% | 2.2% |
| Period 4 of 2026-27 | 7,271 | 85.0% | 1.7% |
| Period 3 of 2026-27 | 7,350 | 83.0% | 2.6% |
| Period 2 of 2026-27 | 6,985 | 86.2% | 2.0% |
| Period 1 of 2026-27 | 8,290 | 89.5% | 0.9% |
| Period 13 of 2025-26 | 7,999 | 87.4% | 1.1% |
| Period 12 of 2025-26 | 7,337 | 86.4% | 0.7% |
| Period 11 of 2025-26 | 7,260 | 84.6% | 1.0% |
| Period 10 of 2025-26 | 5,787 | 83.6% | 2.5% |
| Period 9 of 2025-26 | 7,255 | 79.8% | 1.4% |
| Period 8 of 2025-26 | 7,242 | 79.7% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Petts Wood
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 7,722 | 84.3% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out