Bricket Wood
BWOEast of EnglandManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Bricket Wood had 13,363 scheduled stops to Period 7 of 2026-27, about 37 a day. 95.4% of recorded arrivals were within three minutes of the timetable and 6.2% of scheduled stops were cancelled.
Bricket Wood opened on 5 August 1858, 168 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bricket Wood is the oldest; the next oldest, Park Street, dates from 1858.
The nearest stations to Bricket Wood are How Wood (Hertfordshire) (1.7 km north-east), Park Street (2.6 km north-east), Garston (Hertfordshire) (2.6 km south-west), Radlett (3.6 km south-east) and Watford North (4.0 km south-west). 15 stations lie within 10 km in all. Of the five, Park Street is the most punctual at 96.6% and Radlett the least at 72.1%, with Bricket Wood on 95.4%.
Bricket Wood takes its name from a Village called Bricket Wood, home to about 4,095 people, and the station stands 0.7 km from its centre.
Compared with 3 stations of a similar size in East of England, Bricket Wood is the least punctual, at 95.4%. All of them are ahead, including Garston (Hertfordshire) (96.3%), How Wood (Hertfordshire) (96.2%) and Park Street (96.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 13,363 | 95.4% | 6.2% |
Operators with their own page for this station are linked to it.
Late train at Bricket Wood? Delay Repay
These operators call at Bricket Wood and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,042 | 78.6% | 4.1% |
| Period 6 of 2026-27 | 1,040 | 95.7% | 9.0% |
| Period 5 of 2026-27 | 1,025 | 97.8% | 7.0% |
| Period 4 of 2026-27 | 1,030 | 96.4% | 6.5% |
| Period 3 of 2026-27 | 1,009 | 98.4% | 5.7% |
| Period 2 of 2026-27 | 975 | 95.3% | 6.1% |
| Period 1 of 2026-27 | 973 | 96.6% | 1.4% |
| Period 13 of 2025-26 | 1,160 | 98.8% | 8.1% |
| Period 12 of 2025-26 | 1,050 | 96.3% | 4.2% |
| Period 11 of 2025-26 | 1,050 | 96.3% | 4.8% |
| Period 10 of 2025-26 | 950 | 97.6% | 11.4% |
| Period 9 of 2025-26 | 1,029 | 96.6% | 8.9% |
| Period 8 of 2025-26 | 1,030 | 95.5% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Garston (Hertfordshire) | 13,363 | 96.3% | 6.2% |
| How Wood (Hertfordshire) | 13,363 | 96.2% | 6.2% |
| Park Street | 13,363 | 96.6% | 6.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out