Paisley St James
PYJScotlandManaged by ScotRail
How this station is performing
Paisley St James had 24,299 scheduled stops to Period 7 of 2026-27, about 67 a day. 95.2% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Paisley St James opened on 1 December 1882, 144 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Paisley Gilmour Street is the oldest (1840) and Hillington West the newest (1940), with Paisley St James in between.
The nearest stations to Paisley St James are Paisley Gilmour Street (1.3 km south-east), Paisley Canal (1.8 km south-east), Hawkhead (2.9 km south-east), Johnstone (Renfrewshire) (4.3 km south-west) and Hillington West (4.5 km east). 42 stations lie within 10 km in all. Of the five, Hillington West is the most punctual at 96.3% and Hawkhead the least at 92.2%, with Paisley St James on 95.2%.
Paisley St James is named after Paisley, a town, home to about 77,220 people, but the station stands 1.4 km from its centre.
1 of 3 stations of a similar size in Scotland are more punctual than Paisley St James on 95.2%. The comparison group includes Langbank (96.1%), Stonehaven (79.5%) and Burnside (South Lanarkshire) (94.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,299 | 95.2% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Paisley St James? Delay Repay
These operators call at Paisley St James and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,916 | 95.5% | 1.4% |
| Period 6 of 2026-27 | 1,916 | 96.9% | 0.4% |
| Period 5 of 2026-27 | 1,913 | 96.1% | 2.2% |
| Period 4 of 2026-27 | 1,916 | 96.0% | 0.6% |
| Period 3 of 2026-27 | 1,916 | 95.9% | 0.6% |
| Period 2 of 2026-27 | 1,916 | 93.7% | 0.5% |
| Period 1 of 2026-27 | 2,214 | 96.2% | 3.0% |
| Period 13 of 2025-26 | 1,624 | 97.0% | 1.4% |
| Period 12 of 2025-26 | 1,558 | 95.2% | 0.3% |
| Period 11 of 2025-26 | 1,916 | 96.0% | 0.7% |
| Period 10 of 2025-26 | 1,662 | 93.4% | 1.1% |
| Period 9 of 2025-26 | 1,916 | 93.4% | 2.4% |
| Period 8 of 2025-26 | 1,916 | 92.7% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Langbank | 24,321 | 96.1% | 1.2% |
| Stonehaven | 24,344 | 79.5% | 2.2% |
| Burnside (South Lanarkshire) | 24,244 | 94.0% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out