Langbank
LGBScotlandManaged by ScotRail
How this station is performing
Langbank had 24,321 scheduled stops to Period 7 of 2026-27, about 67 a day. 96.1% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Langbank opened on 3 April 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Langbank is the oldest; the next oldest, Dumbarton Central, dates from 1850.
The nearest stations to Langbank are Dalreoch (2.6 km north), Dumbarton Central (2.7 km north-east), Dumbarton East (2.8 km north-east), Woodhall (4.4 km west) and Renton (5.1 km north). 14 stations lie within 10 km in all. At 96.1%, Langbank is more punctual than every one of them; the best of the five, Woodhall, manages 96.1%.
Langbank takes its name from a Village called Langbank, home to about 890 people, and the station stands 0.1 km from its centre.
Langbank is among the most punctual stations in Britain. Its 96.1% puts it 71st out of 2,374 ranked stations, with 70 ahead of it and 2,303 behind, and 12.2 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in Scotland, Langbank is the most punctual, at 96.1%. The comparison group includes Paisley St James (95.2%), Stonehaven (79.5%) and Woodhall (96.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,321 | 96.1% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Langbank? Delay Repay
These operators call at Langbank and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,920 | 96.4% | 1.3% |
| Period 6 of 2026-27 | 1,920 | 97.8% | 0.4% |
| Period 5 of 2026-27 | 1,917 | 97.0% | 2.3% |
| Period 4 of 2026-27 | 1,920 | 96.2% | 0.6% |
| Period 3 of 2026-27 | 1,920 | 96.2% | 0.6% |
| Period 2 of 2026-27 | 1,918 | 95.2% | 0.5% |
| Period 1 of 2026-27 | 2,214 | 97.1% | 3.0% |
| Period 13 of 2025-26 | 1,624 | 96.9% | 1.4% |
| Period 12 of 2025-26 | 1,558 | 96.1% | 0.3% |
| Period 11 of 2025-26 | 1,916 | 96.9% | 0.8% |
| Period 10 of 2025-26 | 1,662 | 94.4% | 1.1% |
| Period 9 of 2025-26 | 1,916 | 94.7% | 2.4% |
| Period 8 of 2025-26 | 1,916 | 94.3% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Paisley St James | 24,299 | 95.2% | 1.2% |
| Stonehaven | 24,344 | 79.5% | 2.2% |
| Woodhall | 24,371 | 96.1% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out