Ockendon
OCKEast of EnglandManaged by c2c
How this station is performing
Ockendon had 29,042 scheduled stops to Period 7 of 2026-27, about 80 a day. 88.8% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Ockendon opened on 1 July 1892, 134 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Grays is the oldest (1845) and Chafford Hundred Lakeside the newest (1995), with Ockendon in between.
The nearest stations to Ockendon are Chafford Hundred Lakeside (4.0 km south), Upminster (5.0 km north-west), Grays (5.5 km south-east), Purfleet (5.8 km south-west) and West Horndon (6.2 km north-east). 21 stations lie within 10 km in all. Of the five, Upminster is the most punctual at 92.8% and Chafford Hundred Lakeside the least at 88.1%, with Ockendon on 88.8%.
Ockendon is named after South Ockendon, a town, home to about 22,442 people, but the station stands 0.4 km from its centre.
For Ockendon, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 78.4% of stops arrived within three minutes of the timetable. The strongest was Period 5 of 2023-24, at 95.8%, which is 17.4 percentage points higher. Cancellations peaked at 10.6% of scheduled stops in Period 6 of 2026-27, against 3.0% over the latest 13 periods.
2 of 3 stations of a similar size in East of England are more punctual than Ockendon on 88.8%. The comparison group includes Chafford Hundred Lakeside (88.1%), Harlow Mill (89.3%) and Thorpe-le-Soken (95.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| c2c | 29,042 | 88.8% | 3.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,174 | 80.3% | 3.1% |
| Period 6 of 2026-27 | 2,057 | 78.4% | 10.6% |
| Period 5 of 2026-27 | 2,032 | 85.2% | 3.9% |
| Period 4 of 2026-27 | 2,290 | 88.1% | 2.8% |
| Period 3 of 2026-27 | 2,151 | 89.0% | 3.1% |
| Period 2 of 2026-27 | 2,286 | 91.8% | 2.9% |
| Period 1 of 2026-27 | 2,620 | 91.9% | 2.6% |
| Period 13 of 2025-26 | 2,440 | 92.5% | 1.6% |
| Period 12 of 2025-26 | 2,270 | 91.9% | 2.1% |
| Period 11 of 2025-26 | 2,207 | 93.4% | 1.5% |
| Period 10 of 2025-26 | 2,071 | 89.6% | 2.1% |
| Period 9 of 2025-26 | 2,292 | 91.5% | 1.1% |
| Period 8 of 2025-26 | 2,152 | 87.7% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chafford Hundred Lakeside | 29,043 | 88.1% | 3.1% |
| Harlow Mill | 29,201 | 89.3% | 3.2% |
| Thorpe-le-Soken | 29,428 | 95.5% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out