Harlow Mill
HWMEast of EnglandManaged by Greater Anglia
How this station is performing
Harlow Mill had 29,201 scheduled stops to Period 7 of 2026-27, about 80 a day. 89.3% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Harlow Mill opened on 9 August 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Harlow Mill is the oldest; the next oldest, Harlow Town, dates from 1841.
The nearest stations to Harlow Mill are Harlow Town (2.8 km west), Sawbridgeworth (3.3 km north-east), Roydon (6.8 km west), Bishops Stortford (8.8 km north) and Rye House (9.0 km west). 6 stations lie within 10 km in all. Of the five, Rye House is the most punctual at 90.3% and Harlow Town the least at 87.6%, with Harlow Mill on 89.3%.
Harlow Mill is named after Harlow, a new town (UK), home to about 82,059 people, but the station stands 1.3 km from its centre.
For Harlow Mill, the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 83.2% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2024-25, at 96.5%, which is 13.3 percentage points higher.
1 of 3 stations of a similar size in East of England are more punctual than Harlow Mill on 89.3%. The comparison group includes Chafford Hundred Lakeside (88.1%), Ockendon (88.8%) and Thorpe-le-Soken (95.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 29,201 | 89.3% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at Harlow Mill? Delay Repay
These operators call at Harlow Mill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,229 | 87.5% | 3.5% |
| Period 6 of 2026-27 | 2,299 | 88.5% | 3.1% |
| Period 5 of 2026-27 | 2,309 | 83.2% | 6.1% |
| Period 4 of 2026-27 | 2,176 | 88.8% | 3.7% |
| Period 3 of 2026-27 | 2,334 | 87.2% | 3.8% |
| Period 2 of 2026-27 | 2,181 | 92.4% | 2.1% |
| Period 1 of 2026-27 | 2,658 | 93.4% | 2.8% |
| Period 13 of 2025-26 | 2,425 | 90.7% | 1.8% |
| Period 12 of 2025-26 | 2,165 | 89.4% | 4.3% |
| Period 11 of 2025-26 | 2,315 | 91.6% | 2.1% |
| Period 10 of 2025-26 | 1,748 | 91.8% | 1.8% |
| Period 9 of 2025-26 | 2,195 | 85.6% | 2.1% |
| Period 8 of 2025-26 | 2,167 | 90.2% | 3.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chafford Hundred Lakeside | 29,043 | 88.1% | 3.1% |
| Ockendon | 29,042 | 88.8% | 3.0% |
| Thorpe-le-Soken | 29,428 | 95.5% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out