Chafford Hundred Lakeside
CFHEast of EnglandManaged by c2c
How this station is performing
Chafford Hundred Lakeside had 29,043 scheduled stops to Period 7 of 2026-27, about 80 a day. 88.1% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Chafford Hundred Lakeside opened on 30 May 1995, 31 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Chafford Hundred Lakeside is the newest; the oldest, Grays, opened in 1845.
The nearest stations to Chafford Hundred Lakeside are Grays (2.6 km south-east), Purfleet (3.6 km west), Greenhithe for Bluewater (3.9 km south), Ockendon (4.0 km north) and Stone Crossing (4.1 km south-west). 22 stations lie within 10 km in all. Of the five, Purfleet is the most punctual at 91.6% and Greenhithe for Bluewater the least at 82.5%, with Chafford Hundred Lakeside on 88.1%.
Chafford Hundred Lakeside is named after Chafford Hundred, a suburb, home to about 15,699 people, but the station stands 1.0 km from its centre.
Compared with 3 stations of a similar size in East of England, Chafford Hundred Lakeside is the least punctual, at 88.1%. All of them are ahead, including Ockendon (88.8%), Harlow Mill (89.3%) and Thorpe-le-Soken (95.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| c2c | 29,043 | 88.1% | 3.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,174 | 79.9% | 3.2% |
| Period 6 of 2026-27 | 2,059 | 77.6% | 11.1% |
| Period 5 of 2026-27 | 2,032 | 84.1% | 3.9% |
| Period 4 of 2026-27 | 2,290 | 86.9% | 2.8% |
| Period 3 of 2026-27 | 2,151 | 88.6% | 3.1% |
| Period 2 of 2026-27 | 2,286 | 90.9% | 2.9% |
| Period 1 of 2026-27 | 2,620 | 91.4% | 2.6% |
| Period 13 of 2025-26 | 2,440 | 91.9% | 1.6% |
| Period 12 of 2025-26 | 2,270 | 91.5% | 2.1% |
| Period 11 of 2025-26 | 2,207 | 92.9% | 1.5% |
| Period 10 of 2025-26 | 2,071 | 88.3% | 2.1% |
| Period 9 of 2025-26 | 2,292 | 91.2% | 1.1% |
| Period 8 of 2025-26 | 2,151 | 86.6% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ockendon | 29,042 | 88.8% | 3.0% |
| Harlow Mill | 29,201 | 89.3% | 3.2% |
| Thorpe-le-Soken | 29,428 | 95.5% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out