Nutfield
NUFSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Nutfield had 15,763 scheduled stops to Period 7 of 2026-27, about 43 a day. 82.5% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Nutfield opened on 1 January 1884, 142 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Redhill is the oldest (1841) and Salfords (Surrey) the newest (1932), with Nutfield in between.
The nearest stations to Nutfield are Earlswood (Surrey) (2.7 km west), Redhill (2.7 km north-west), Salfords (Surrey) (3.5 km south-west), Merstham (4.3 km north) and Reigate (5.2 km west). 19 stations lie within 10 km in all. At 82.5%, Nutfield is more punctual than every one of them; the best of the five, Reigate, manages 81.8%.
Nutfield is one of 2 stations named after a Village called Nutfield, home to about 2,728 people; this one stands 1.3 km from its centre.
Nutfield has slipped sharply. 82.5% of stops came within three minutes of the timetable in the latest 13 periods, 9.3 percentage points worse than the 91.8% recorded in the 13 before. Cancellations held steady at 1.5% of scheduled stops, against 1.7% before.
Compared with 3 stations of a similar size in South East, Nutfield is the least punctual, at 82.5%. All of them are ahead, including Edenbridge (Kent) (91.1%), Godstone (86.2%) and Sandling (82.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 15,763 | 82.5% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Nutfield? Delay Repay
These operators call at Nutfield and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,232 | 29.9% | 2.0% |
| Period 6 of 2026-27 | 1,188 | 30.7% | 1.9% |
| Period 5 of 2026-27 | 1,233 | 89.9% | 3.4% |
| Period 4 of 2026-27 | 1,240 | 93.5% | 2.2% |
| Period 3 of 2026-27 | 1,199 | 92.4% | 1.3% |
| Period 2 of 2026-27 | 1,213 | 94.5% | 0.7% |
| Period 1 of 2026-27 | 1,399 | 93.4% | 0.7% |
| Period 13 of 2025-26 | 1,330 | 95.2% | 0.5% |
| Period 12 of 2025-26 | 1,232 | 94.1% | 0.1% |
| Period 11 of 2025-26 | 1,029 | 91.8% | 1.2% |
| Period 10 of 2025-26 | 1,012 | 86.5% | 2.7% |
| Period 9 of 2025-26 | 1,220 | 87.9% | 2.2% |
| Period 8 of 2025-26 | 1,236 | 89.6% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Edenbridge (Kent) | 15,763 | 91.1% | 1.4% |
| Godstone | 15,763 | 86.2% | 1.5% |
| Sandling | 15,759 | 82.6% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out