Southeastern at Nunhead
How this operator is doing here
Southeastern had 25,124 scheduled stops at Nunhead in the 13 periods to Period 7 of 2026-27, 43% of the station's total. 86.1% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
Southeastern trains at Nunhead also serve Peckham Rye (1.2 km west, 81.3% on time, 2.0% cancelled), New Cross (1.7 km north-east, 90.1% on time, 1.5% cancelled), Crofton Park (1.7 km south-east, 83.4% on time, 2.8% cancelled), St Johns (London) (2.1 km east, 91.9% on time, 1.5% cancelled), Deptford (2.2 km north-east, 88.0% on time, 1.9% cancelled) and Ladywell (2.6 km south-east, 93.0% on time, 1.1% cancelled), which are the stations on its network closest to Nunhead.
Within 30 km of here, Southeastern runs best at Sundridge Park, 7.8 km south-east (99.4%), and worst at Sevenoaks, 26.7 km south-east (72.3%).
The busiest Southeastern station within 30 km of Nunhead is London Bridge, 4.8 km north-west, with about 912 scheduled stops a day.
Southeastern at Nunhead improved sharply over the past year. In the latest 13 periods 86.1% of stops came within three minutes of the timetable, up 5.9 percentage points from 80.2% in the 13 before. Cancellations held steady at 2.2% of scheduled stops, against 2.0% before.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,824 | 86.2% | 1.0% |
| Period 6 of 2026-27 | 1,895 | 84.6% | 0.8% |
| Period 5 of 2026-27 | 2,047 | 80.7% | 2.6% |
| Period 4 of 2026-27 | 1,889 | 86.7% | 1.7% |
| Period 3 of 2026-27 | 1,962 | 83.6% | 1.7% |
| Period 2 of 2026-27 | 1,895 | 85.0% | 9.4% |
| Period 1 of 2026-27 | 2,324 | 92.3% | 4.6% |
| Period 13 of 2025-26 | 1,894 | 90.3% | 0.9% |
| Period 12 of 2025-26 | 1,979 | 90.5% | 0.8% |
| Period 11 of 2025-26 | 1,895 | 86.3% | 0.9% |
| Period 10 of 2025-26 | 1,508 | 83.3% | 2.1% |
| Period 9 of 2025-26 | 1,981 | 84.7% | 0.3% |
| Period 8 of 2025-26 | 2,031 | 83.4% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Nunhead
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 32,761 | 85.6% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out