Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Southeastern at Nunhead

All trains at NunheadSoutheastern across BritainLondon

On time, last 13 periods86.1%Whole station: 85.8%
Cancelled2.2%Whole station: 3.3%
Scheduled stops25,124Of 57,885 at the station

How this operator is doing here

Southeastern had 25,124 scheduled stops at Nunhead in the 13 periods to Period 7 of 2026-27, 43% of the station's total. 86.1% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.

Southeastern trains at Nunhead also serve Peckham Rye (1.2 km west, 81.3% on time, 2.0% cancelled), New Cross (1.7 km north-east, 90.1% on time, 1.5% cancelled), Crofton Park (1.7 km south-east, 83.4% on time, 2.8% cancelled), St Johns (London) (2.1 km east, 91.9% on time, 1.5% cancelled), Deptford (2.2 km north-east, 88.0% on time, 1.9% cancelled) and Ladywell (2.6 km south-east, 93.0% on time, 1.1% cancelled), which are the stations on its network closest to Nunhead.

Within 30 km of here, Southeastern runs best at Sundridge Park, 7.8 km south-east (99.4%), and worst at Sevenoaks, 26.7 km south-east (72.3%).

The busiest Southeastern station within 30 km of Nunhead is London Bridge, 4.8 km north-west, with about 912 scheduled stops a day.

Southeastern at Nunhead improved sharply over the past year. In the latest 13 periods 86.1% of stops came within three minutes of the timetable, up 5.9 percentage points from 80.2% in the 13 before. Cancellations held steady at 2.2% of scheduled stops, against 2.0% before.

Period by period

60%70%80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 96.7%Period 2 of 2023-24: 95.9%Period 3 of 2023-24: 92.0%Period 4 of 2023-24: 92.8%Period 5 of 2023-24: 93.9%Period 6 of 2023-24: 92.8%Period 7 of 2023-24: 91.3%Period 8 of 2023-24: 93.7%Period 9 of 2023-24: 91.6%Period 10 of 2023-24: 88.1%Period 11 of 2023-24: 91.7%Period 12 of 2023-24: 91.2%Period 13 of 2023-24: 93.0%Period 1 of 2024-25: 94.8%Period 2 of 2024-25: 94.8%Period 3 of 2024-25: 85.4%Period 4 of 2024-25: 79.7%Period 5 of 2024-25: 80.2%Period 6 of 2024-25: 79.2%Period 7 of 2024-25: 78.3%Period 8 of 2024-25: 74.1%Period 9 of 2024-25: 62.9%Period 10 of 2024-25: 80.5%Period 11 of 2024-25: 75.1%Period 12 of 2024-25: 81.6%Period 13 of 2024-25: 76.7%Period 1 of 2025-26: 83.4%Period 2 of 2025-26: 82.8%Period 3 of 2025-26: 87.3%Period 4 of 2025-26: 86.0%Period 5 of 2025-26: 85.8%Period 6 of 2025-26: 85.0%Period 7 of 2025-26: 81.8%Period 8 of 2025-26: 83.4%Period 9 of 2025-26: 84.7%Period 10 of 2025-26: 83.3%Period 11 of 2025-26: 86.3%Period 12 of 2025-26: 90.5%Period 13 of 2025-26: 90.3%Period 1 of 2026-27: 92.3%Period 2 of 2026-27: 85.0%Period 3 of 2026-27: 83.6%Period 4 of 2026-27: 86.7%Period 5 of 2026-27: 80.7%Period 6 of 2026-27: 84.6%Period 7 of 2026-27: 86.2%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 0.7%Period 2 of 2023-24: 1.6%Period 3 of 2023-24: 1.7%Period 4 of 2023-24: 1.5%Period 5 of 2023-24: 1.2%Period 6 of 2023-24: 1.0%Period 7 of 2023-24: 2.5%Period 8 of 2023-24: 0.7%Period 9 of 2023-24: 1.0%Period 10 of 2023-24: 4.4%Period 11 of 2023-24: 0.9%Period 12 of 2023-24: 1.5%Period 13 of 2023-24: 1.1%Period 1 of 2024-25: 0.4%Period 2 of 2024-25: 0.8%Period 3 of 2024-25: 1.8%Period 4 of 2024-25: 2.0%Period 5 of 2024-25: 4.9%Period 6 of 2024-25: 0.5%Period 7 of 2024-25: 2.6%Period 8 of 2024-25: 2.9%Period 9 of 2024-25: 2.1%Period 10 of 2024-25: 2.7%Period 11 of 2024-25: 1.5%Period 12 of 2024-25: 1.8%Period 13 of 2024-25: 2.5%Period 1 of 2025-26: 0.9%Period 2 of 2025-26: 1.2%Period 3 of 2025-26: 2.1%Period 4 of 2025-26: 0.8%Period 5 of 2025-26: 2.1%Period 6 of 2025-26: 2.0%Period 7 of 2025-26: 3.2%Period 8 of 2025-26: 0.8%Period 9 of 2025-26: 0.3%Period 10 of 2025-26: 2.1%Period 11 of 2025-26: 0.9%Period 12 of 2025-26: 0.8%Period 13 of 2025-26: 0.9%Period 1 of 2026-27: 4.6%Period 2 of 2026-27: 9.4%Period 3 of 2026-27: 1.7%Period 4 of 2026-27: 1.7%Period 5 of 2026-27: 2.6%Period 6 of 2026-27: 0.8%Period 7 of 2026-27: 1.0%2023-242024-252025-262026-27

See how Southeastern Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,82486.2%1.0%
Period 6 of 2026-271,89584.6%0.8%
Period 5 of 2026-272,04780.7%2.6%
Period 4 of 2026-271,88986.7%1.7%
Period 3 of 2026-271,96283.6%1.7%
Period 2 of 2026-271,89585.0%9.4%
Period 1 of 2026-272,32492.3%4.6%
Period 13 of 2025-261,89490.3%0.9%
Period 12 of 2025-261,97990.5%0.8%
Period 11 of 2025-261,89586.3%0.9%
Period 10 of 2025-261,50883.3%2.1%
Period 9 of 2025-261,98184.7%0.3%
Period 8 of 2025-262,03183.4%0.8%

Time of year

75%80%85%90%95%P1: 92.0%1P2: 89.7%2P3: 86.9%3P4: 86.4%4P5: 85.0%5P6: 85.6%6P7: 84.3%7P8: 83.9%8P9: 79.9%9P10: 83.8%10P11: 84.2%11P12: 87.7%12P13: 86.5%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Nunhead

OperatorScheduled stopsWithin 3 minCancelled
GTR32,76185.6%4.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out