Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Nunhead

All trains at NunheadGTR across BritainLondon

On time, last 13 periods85.6%Whole station: 85.8%
Cancelled4.2%Whole station: 3.3%
Scheduled stops32,761Of 57,885 at the station

How this operator is doing here

GTR had 32,761 scheduled stops at Nunhead in the 13 periods to Period 7 of 2026-27, 57% of the station's total. 85.6% of recorded arrivals came within three minutes and 4.2% of stops were cancelled.

GTR trains at Nunhead also serve Queens Road (Peckham) (0.9 km north-west, 94.8% on time, 2.5% cancelled), Brockley (1.1 km east, 94.1% on time, 3.7% cancelled), Peckham Rye (1.2 km west, 91.6% on time, 3.2% cancelled), New Cross Gate (1.3 km north-east, 92.9% on time, 3.7% cancelled), Crofton Park (1.7 km south-east, 92.0% on time, 4.1% cancelled) and Honor Oak Park (1.9 km south, 91.8% on time, 3.7% cancelled), which are the stations on its network closest to Nunhead.

Within 30 km of here, GTR runs best at Beckenham Junction, 6.5 km south (98.1%), and worst at Kenley, 16.2 km south (66.9%).

The busiest GTR station within 30 km of Nunhead is East Croydon, 10.5 km south, with about 813 scheduled stops a day.

Of the 2 operators with enough records at Nunhead, GTR is the least punctual, at 85.6%.

For GTR, Nunhead is the 118th best of 307 ranked stations. Its 85.6% here is 2.7 percentage points above the 82.9% across the whole network.

Period by period

75%80%85%90%95%2023-242024-252025-262026-27Period 1 of 2023-24: 92.6%Period 2 of 2023-24: 91.4%Period 3 of 2023-24: 87.7%Period 4 of 2023-24: 89.2%Period 5 of 2023-24: 92.2%Period 6 of 2023-24: 89.8%Period 7 of 2023-24: 89.3%Period 8 of 2023-24: 85.7%Period 9 of 2023-24: 84.0%Period 10 of 2023-24: 83.8%Period 11 of 2023-24: 85.0%Period 12 of 2023-24: 89.1%Period 13 of 2023-24: 91.0%Period 1 of 2024-25: 90.2%Period 2 of 2024-25: 89.3%Period 3 of 2024-25: 88.6%Period 4 of 2024-25: 86.4%Period 5 of 2024-25: 87.2%Period 6 of 2024-25: 85.8%Period 7 of 2024-25: 82.6%Period 8 of 2024-25: 82.1%Period 9 of 2024-25: 77.7%Period 10 of 2024-25: 84.6%Period 11 of 2024-25: 82.0%Period 12 of 2024-25: 86.1%Period 13 of 2024-25: 85.9%Period 1 of 2025-26: 89.8%Period 2 of 2025-26: 86.5%Period 3 of 2025-26: 88.5%Period 4 of 2025-26: 85.8%Period 5 of 2025-26: 88.5%Period 6 of 2025-26: 86.5%Period 7 of 2025-26: 86.9%Period 8 of 2025-26: 80.5%Period 9 of 2025-26: 81.0%Period 10 of 2025-26: 83.7%Period 11 of 2025-26: 87.2%Period 12 of 2025-26: 88.7%Period 13 of 2025-26: 89.1%Period 1 of 2026-27: 91.3%Period 2 of 2026-27: 88.8%Period 3 of 2026-27: 86.4%Period 4 of 2026-27: 85.5%Period 5 of 2026-27: 84.2%Period 6 of 2026-27: 82.8%Period 7 of 2026-27: 82.7%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 4.4%Period 2 of 2023-24: 2.3%Period 3 of 2023-24: 3.5%Period 4 of 2023-24: 3.0%Period 5 of 2023-24: 2.8%Period 6 of 2023-24: 2.4%Period 7 of 2023-24: 3.0%Period 8 of 2023-24: 2.9%Period 9 of 2023-24: 5.5%Period 10 of 2023-24: 5.7%Period 11 of 2023-24: 2.9%Period 12 of 2023-24: 2.3%Period 13 of 2023-24: 2.6%Period 1 of 2024-25: 4.0%Period 2 of 2024-25: 4.2%Period 3 of 2024-25: 4.5%Period 4 of 2024-25: 4.9%Period 5 of 2024-25: 3.4%Period 6 of 2024-25: 2.1%Period 7 of 2024-25: 6.1%Period 8 of 2024-25: 5.6%Period 9 of 2024-25: 7.7%Period 10 of 2024-25: 8.2%Period 11 of 2024-25: 1.9%Period 12 of 2024-25: 5.3%Period 13 of 2024-25: 3.8%Period 1 of 2025-26: 3.2%Period 2 of 2025-26: 2.9%Period 3 of 2025-26: 4.5%Period 4 of 2025-26: 3.6%Period 5 of 2025-26: 4.6%Period 6 of 2025-26: 7.0%Period 7 of 2025-26: 5.4%Period 8 of 2025-26: 3.8%Period 9 of 2025-26: 6.6%Period 10 of 2025-26: 6.6%Period 11 of 2025-26: 2.9%Period 12 of 2025-26: 2.8%Period 13 of 2025-26: 3.3%Period 1 of 2026-27: 2.2%Period 2 of 2026-27: 7.0%Period 3 of 2026-27: 5.4%Period 4 of 2026-27: 4.2%Period 5 of 2026-27: 3.8%Period 6 of 2026-27: 4.6%Period 7 of 2026-27: 2.5%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-272,56182.7%2.5%
Period 6 of 2026-272,56882.8%4.6%
Period 5 of 2026-272,62484.2%3.8%
Period 4 of 2026-272,62085.5%4.2%
Period 3 of 2026-272,37586.4%5.4%
Period 2 of 2026-272,31188.8%7.0%
Period 1 of 2026-272,87791.3%2.2%
Period 13 of 2025-262,79389.1%3.3%
Period 12 of 2025-262,56088.7%2.8%
Period 11 of 2025-262,59687.2%2.9%
Period 10 of 2025-261,76283.7%6.6%
Period 9 of 2025-262,62881.0%6.6%
Period 8 of 2025-262,48680.5%3.8%

Time of year

75%80%85%90%95%P1: 91.0%1P2: 89.0%2P3: 87.8%3P4: 86.7%4P5: 87.9%5P6: 86.2%6P7: 85.3%7P8: 82.8%8P9: 80.8%9P10: 84.0%10P11: 84.7%11P12: 88.0%12P13: 88.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Nunhead

OperatorScheduled stopsWithin 3 minCancelled
Southeastern25,12486.1%2.2%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out