Nunhead
NHDLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Nunhead had 57,885 scheduled stops to Period 7 of 2026-27, about 159 a day. 85.8% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Nunhead opened on 18 September 1871, 155 years before the latest figures here, and has not been moved since. The First World War closed Nunhead on 1 January 1917, and it reopened on 1 March 1919. Of the 5 stations nearest to it with a known opening date, Nunhead is the newest; the oldest, New Cross Gate, opened in 1839.
The nearest stations to Nunhead are Queens Road (Peckham) (0.9 km north-west), Brockley (1.1 km east), Peckham Rye (1.2 km west), New Cross Gate (1.3 km north-east) and New Cross (1.7 km north-east). 134 stations lie within 10 km in all. At 85.8%, Nunhead is less punctual than all of them; the best of the five, Brockley, manages 92.5%.
Nunhead takes its name from an area of London called Nunhead, home to about 13,620 people, and the station stands 0.5 km from its centre.
2 operators call at Nunhead: GTR (85.6%, 57% of stops) and Southeastern (86.1%, 43% of stops). They are close together, with Southeastern leading on 86.1% and GTR trailing on 85.6%, a gap of 0.5 percentage points.
Compared with 3 stations of a similar size in London, Nunhead is the least punctual, at 85.8%. All of them are ahead, including Albany Park (89.0%), White Hart Lane (94.7%) and Edmonton Green (94.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 32,761 | 85.6% | 4.2% |
| Southeastern | 25,124 | 86.1% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Nunhead? Delay Repay
These operators call at Nunhead and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,385 | 84.2% | 1.9% |
| Period 6 of 2026-27 | 4,463 | 83.6% | 3.0% |
| Period 5 of 2026-27 | 4,671 | 82.7% | 3.3% |
| Period 4 of 2026-27 | 4,509 | 86.0% | 3.1% |
| Period 3 of 2026-27 | 4,337 | 85.1% | 3.8% |
| Period 2 of 2026-27 | 4,206 | 87.1% | 8.1% |
| Period 1 of 2026-27 | 5,201 | 91.7% | 3.2% |
| Period 13 of 2025-26 | 4,687 | 89.6% | 2.3% |
| Period 12 of 2025-26 | 4,539 | 89.5% | 1.9% |
| Period 11 of 2025-26 | 4,491 | 86.8% | 2.0% |
| Period 10 of 2025-26 | 3,270 | 83.5% | 4.5% |
| Period 9 of 2025-26 | 4,609 | 82.6% | 3.9% |
| Period 8 of 2025-26 | 4,517 | 81.8% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Albany Park | 58,100 | 89.0% | 1.4% |
| White Hart Lane | 57,570 | 94.7% | 2.0% |
| Edmonton Green | 57,317 | 94.4% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out