GTR at Norwood Junction
How this operator is doing here
GTR had 92,274 scheduled stops at Norwood Junction in the 13 periods to Period 7 of 2026-27, 64% of the station's total. 86.8% of recorded arrivals came within three minutes and 3.9% of stops were cancelled.
GTR trains at Norwood Junction also serve Selhurst (1.1 km south-west, 90.2% on time, 3.3% cancelled), Birkbeck (1.5 km north-east, 98.1% on time, 2.8% cancelled), Thornton Heath (1.8 km west, 93.4% on time, 3.1% cancelled), Anerley (1.9 km north, 87.2% on time, 4.7% cancelled), Crystal Palace (2.3 km north, 93.6% on time, 2.8% cancelled) and Penge West (2.5 km north-east, 86.2% on time, 4.7% cancelled), which are the stations on its network closest to Norwood Junction.
Within 30 km of here, GTR runs best at Birkbeck, 1.5 km north-east (98.1%), and worst at Kenley, 8.3 km south (66.9%).
The busiest GTR station within 30 km of Norwood Junction is East Croydon, 2.7 km south-west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Norwood Junction, GTR is the least punctual, at 86.8%.
For GTR, Norwood Junction is the 103rd best of 307 ranked stations. Its 86.8% here is 3.9 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 7,202 | 83.5% | 3.3% |
| Period 6 of 2026-27 | 6,910 | 84.6% | 4.9% |
| Period 5 of 2026-27 | 6,816 | 85.1% | 4.0% |
| Period 4 of 2026-27 | 6,904 | 85.4% | 4.8% |
| Period 3 of 2026-27 | 6,671 | 85.8% | 3.0% |
| Period 2 of 2026-27 | 7,069 | 89.1% | 2.8% |
| Period 1 of 2026-27 | 8,544 | 90.9% | 3.9% |
| Period 13 of 2025-26 | 7,769 | 89.7% | 2.1% |
| Period 12 of 2025-26 | 7,175 | 87.1% | 7.0% |
| Period 11 of 2025-26 | 7,017 | 85.3% | 4.0% |
| Period 10 of 2025-26 | 6,175 | 88.6% | 3.4% |
| Period 9 of 2025-26 | 7,116 | 85.5% | 4.9% |
| Period 8 of 2025-26 | 6,906 | 87.1% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Norwood Junction
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 50,843 | 90.5% | 7.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out