Northampton
NMPEast MidlandsManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Northampton had 33,593 scheduled stops to Period 7 of 2026-27, about 92 a day. 68.9% of recorded arrivals were within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Northampton opened on 16 February 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Wolverton is the oldest (1838) and Milton Keynes Central the newest (1982), with Northampton in between.
Northampton is remote: its nearest neighbours are Long Buckby (13.8 km north-west), Wellingborough (17.3 km north-east), Wolverton (20.3 km south), Kettering (21.0 km north-east) and Milton Keynes Central (24.3 km south). Of the five, Wellingborough is the most punctual at 79.2% and Milton Keynes Central the least at 63.1%, with Northampton on 68.9%.
Northampton takes its name from a county town called Northampton, home to about 245,899 people, and the station stands 0.7 km from its centre.
2 operators call at Northampton: West Midlands Railway (69.0%, 98% of stops) and Avanti (71.7%, 2% of stops). They are close together, with Avanti leading on 71.7% and West Midlands Railway trailing on 69.0%, a gap of 2.7 percentage points.
1 of 3 stations of a similar size in East Midlands are more punctual than Northampton on 68.9%. The comparison group includes Newark Northgate (69.0%), Loughborough (65.2%) and East Midlands Parkway (65.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 33,088 | 69.0% | 4.0% |
| Avanti | 505 | 71.7% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Northampton? Delay Repay
These operators call at Northampton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,596 | 68.7% | 3.3% |
| Period 6 of 2026-27 | 2,545 | 57.8% | 5.6% |
| Period 5 of 2026-27 | 2,576 | 66.9% | 7.2% |
| Period 4 of 2026-27 | 2,486 | 62.9% | 5.4% |
| Period 3 of 2026-27 | 2,447 | 69.3% | 3.4% |
| Period 2 of 2026-27 | 2,440 | 67.3% | 5.8% |
| Period 1 of 2026-27 | 2,931 | 75.8% | 1.7% |
| Period 13 of 2025-26 | 2,768 | 76.8% | 2.3% |
| Period 12 of 2025-26 | 2,554 | 74.8% | 1.9% |
| Period 11 of 2025-26 | 2,573 | 73.3% | 3.4% |
| Period 10 of 2025-26 | 2,616 | 70.2% | 4.6% |
| Period 9 of 2025-26 | 2,483 | 63.7% | 3.9% |
| Period 8 of 2025-26 | 2,578 | 64.6% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Newark Northgate | 33,650 | 69.0% | 2.8% |
| Loughborough | 38,326 | 65.2% | 4.7% |
| East Midlands Parkway | 39,452 | 65.7% | 4.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out