Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Loughborough

LBOEast MidlandsManaged by East Midlands Railway

On time, last 13 periods65.2%Great Britain: 83.6%
Cancelled4.7%Great Britain: 3.2%
Stops a day105Scheduled, on average
Punctuality rank2276th of 2,374Among ranked stations

How this station is performing

Loughborough had 38,326 scheduled stops to Period 7 of 2026-27, about 105 a day. 65.2% of recorded arrivals were within three minutes of the timetable and 4.7% of scheduled stops were cancelled.

Loughborough opened on 5 May 1840. It was moved to the site it uses now on 13 May 1872. Of the 5 stations nearest to it with a known opening date, Loughborough is the oldest; the next oldest, Barrow-upon-Soar, dates from 1840.

The nearest stations to Loughborough are Barrow-upon-Soar (4.8 km south-east), Sileby (8.0 km south-east), East Midlands Parkway (10.2 km north-west), Syston (12.2 km south-east) and Long Eaton (13.2 km north-west). 2 stations lie within 10 km in all. At 65.2%, Loughborough is less punctual than all of them; the best of the five, Barrow-upon-Soar, manages 84.8%.

Loughborough takes its name from a town called Loughborough, home to about 64,880 people, and the station stands 1.1 km from its centre.

Loughborough is among the least punctual stations in Britain. Its 65.2% within three minutes places it 2276th of 2,374, with 2,275 stations doing better and 98 doing worse. The national median is 83.9%, which is 18.7 percentage points higher.

Compared with 3 stations of a similar size in East Midlands, Loughborough is the least punctual, at 65.2%. All of them are ahead, including East Midlands Parkway (65.7%), Newark Northgate (69.0%) and Northampton (68.9%).

Period by period

50%60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 69.7%Period 2 of 2023-24: 71.3%Period 3 of 2023-24: 62.9%Period 4 of 2023-24: 70.2%Period 5 of 2023-24: 69.8%Period 6 of 2023-24: 69.7%Period 7 of 2023-24: 64.5%Period 8 of 2023-24: 55.0%Period 9 of 2023-24: 55.3%Period 10 of 2023-24: 56.6%Period 11 of 2023-24: 64.2%Period 12 of 2023-24: 67.2%Period 13 of 2023-24: 72.2%Period 1 of 2024-25: 69.2%Period 2 of 2024-25: 69.9%Period 3 of 2024-25: 68.6%Period 4 of 2024-25: 68.0%Period 5 of 2024-25: 67.1%Period 6 of 2024-25: 66.5%Period 7 of 2024-25: 64.3%Period 8 of 2024-25: 63.0%Period 9 of 2024-25: 58.3%Period 10 of 2024-25: 67.4%Period 11 of 2024-25: 67.6%Period 12 of 2024-25: 72.5%Period 13 of 2024-25: 72.9%Period 1 of 2025-26: 72.9%Period 2 of 2025-26: 73.8%Period 3 of 2025-26: 70.9%Period 4 of 2025-26: 71.1%Period 5 of 2025-26: 68.1%Period 6 of 2025-26: 68.8%Period 7 of 2025-26: 66.4%Period 8 of 2025-26: 64.6%Period 9 of 2025-26: 57.9%Period 10 of 2025-26: 69.4%Period 11 of 2025-26: 71.2%Period 12 of 2025-26: 68.9%Period 13 of 2025-26: 64.5%Period 1 of 2026-27: 65.4%Period 2 of 2026-27: 64.0%Period 3 of 2026-27: 60.1%Period 4 of 2026-27: 61.5%Period 5 of 2026-27: 65.2%Period 6 of 2026-27: 66.7%Period 7 of 2026-27: 67.9%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 1.1%Period 2 of 2023-24: 0.8%Period 3 of 2023-24: 1.6%Period 4 of 2023-24: 1.7%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 0.8%Period 7 of 2023-24: 1.8%Period 8 of 2023-24: 4.7%Period 9 of 2023-24: 2.9%Period 10 of 2023-24: 4.8%Period 11 of 2023-24: 1.6%Period 12 of 2023-24: 1.4%Period 13 of 2023-24: 1.0%Period 1 of 2024-25: 1.7%Period 2 of 2024-25: 1.4%Period 3 of 2024-25: 1.7%Period 4 of 2024-25: 3.2%Period 5 of 2024-25: 1.6%Period 6 of 2024-25: 2.2%Period 7 of 2024-25: 1.9%Period 8 of 2024-25: 4.5%Period 9 of 2024-25: 4.6%Period 10 of 2024-25: 3.0%Period 11 of 2024-25: 3.4%Period 12 of 2024-25: 1.7%Period 13 of 2024-25: 1.9%Period 1 of 2025-26: 1.0%Period 2 of 2025-26: 1.4%Period 3 of 2025-26: 2.9%Period 4 of 2025-26: 2.3%Period 5 of 2025-26: 3.6%Period 6 of 2025-26: 1.6%Period 7 of 2025-26: 2.9%Period 8 of 2025-26: 1.5%Period 9 of 2025-26: 3.4%Period 10 of 2025-26: 2.5%Period 11 of 2025-26: 2.7%Period 12 of 2025-26: 3.4%Period 13 of 2025-26: 5.2%Period 1 of 2026-27: 5.4%Period 2 of 2026-27: 6.4%Period 3 of 2026-27: 7.9%Period 4 of 2026-27: 9.2%Period 5 of 2026-27: 5.8%Period 6 of 2026-27: 4.9%Period 7 of 2026-27: 3.5%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
East Midlands Railway38,32665.2%4.7%

Operators with their own page for this station are linked to it.

Late train at Loughborough? Delay Repay

These operators call at Loughborough and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-272,89767.9%3.5%
Period 6 of 2026-272,80166.7%4.9%
Period 5 of 2026-272,67765.2%5.8%
Period 4 of 2026-272,77561.5%9.2%
Period 3 of 2026-272,86760.1%7.9%
Period 2 of 2026-273,00164.0%6.4%
Period 1 of 2026-273,45465.4%5.4%
Period 13 of 2025-263,27464.5%5.2%
Period 12 of 2025-263,00768.9%3.4%
Period 11 of 2025-262,99771.2%2.7%
Period 10 of 2025-262,75269.4%2.5%
Period 9 of 2025-262,82857.9%3.4%
Period 8 of 2025-262,99664.6%1.5%

Time of year

60%70%80%90%P1: 69.1%1P2: 69.8%2P3: 65.8%3P4: 67.9%4P5: 67.6%5P6: 67.9%6P7: 65.8%7P8: 60.9%8P9: 57.2%9P10: 64.5%10P11: 67.7%11P12: 69.5%12P13: 69.8%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in East Midlands

StationScheduled stopsWithin 3 minCancelled
East Midlands Parkway39,45265.7%4.7%
Newark Northgate33,65069.0%2.8%
Northampton33,59368.9%4.0%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out