West Midlands Railway at Northampton
All trains at NorthamptonWest Midlands Railway across BritainEast Midlands
How this operator is doing here
West Midlands Railway had 33,088 scheduled stops at Northampton in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 69.0% of recorded arrivals came within three minutes and 4.0% of stops were cancelled.
West Midlands Railway trains at Northampton also serve Long Buckby (13.8 km north-west, 73.7% on time, 5.0% cancelled), Wolverton (20.3 km south, 75.3% on time, 4.3% cancelled), Milton Keynes Central (24.3 km south, 71.7% on time, 4.6% cancelled), Rugby (28.2 km north-west, 67.9% on time, 4.0% cancelled), Bletchley (29.3 km south-east, 75.0% on time, 5.1% cancelled) and Fenny Stratford (29.4 km south-east, 94.6% on time, 7.3% cancelled), which are the stations on its network closest to Northampton.
Within 30 km of here, West Midlands Railway runs best at Bow Brickhill, 29.6 km south-east (94.8%), and worst at Rugby, 28.2 km north-west (67.9%).
The busiest West Midlands Railway station within 30 km of Northampton is Milton Keynes Central, 24.3 km south, with about 171 scheduled stops a day.
West Midlands Railway at Northampton has slipped sharply. 69.0% of stops came within three minutes of the timetable in the latest 13 periods, 5.9 percentage points worse than the 74.9% recorded in the 13 before. Cancellations rose to 4.0% of scheduled stops from 3.2%, which is 0.8 percentage points more.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,577 | 69.1% | 3.3% |
| Period 6 of 2026-27 | 2,526 | 58.0% | 5.6% |
| Period 5 of 2026-27 | 2,559 | 67.2% | 7.2% |
| Period 4 of 2026-27 | 2,468 | 63.1% | 5.3% |
| Period 3 of 2026-27 | 2,432 | 69.6% | 3.3% |
| Period 2 of 2026-27 | 2,425 | 67.7% | 5.8% |
| Period 1 of 2026-27 | 2,910 | 76.1% | 1.6% |
| Period 13 of 2025-26 | 2,748 | 77.0% | 2.3% |
| Period 12 of 2025-26 | 2,537 | 75.0% | 1.9% |
| Period 11 of 2025-26 | 2,482 | 73.5% | 3.5% |
| Period 10 of 2025-26 | 2,394 | 69.9% | 4.8% |
| Period 9 of 2025-26 | 2,468 | 63.8% | 3.8% |
| Period 8 of 2025-26 | 2,562 | 64.8% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Northampton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 505 | 71.7% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out