East Midlands Parkway
EMDEast MidlandsManaged by East Midlands Railway
How this station is performing
East Midlands Parkway had 39,452 scheduled stops to Period 7 of 2026-27, about 108 a day. 65.7% of recorded arrivals were within three minutes of the timetable and 4.7% of scheduled stops were cancelled.
East Midlands Parkway opened on 26 January 2009, 17 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, East Midlands Parkway is the newest; the oldest, Beeston, opened in 1839.
The nearest stations to East Midlands Parkway are Long Eaton (3.0 km north-west), Attenborough (5.4 km north-east), Beeston (7.5 km north-east), Loughborough (10.2 km south-east) and Spondon (11.4 km north-west). 3 stations lie within 10 km in all. Of the five, Attenborough is the most punctual at 81.7% and Loughborough the least at 65.2%, with East Midlands Parkway on 65.7%.
East Midlands Parkway is among the least punctual stations in Britain. Its 65.7% within three minutes places it 2265th of 2,374, with 2,264 stations doing better and 109 doing worse. The national median is 83.9%, which is 18.2 percentage points higher.
2 of 3 stations of a similar size in East Midlands are more punctual than East Midlands Parkway on 65.7%. The comparison group includes Loughborough (65.2%), Newark Northgate (69.0%) and Northampton (68.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 39,452 | 65.7% | 4.7% |
Operators with their own page for this station are linked to it.
Late train at East Midlands Parkway? Delay Repay
These operators call at East Midlands Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,968 | 68.3% | 3.6% |
| Period 6 of 2026-27 | 2,865 | 67.2% | 5.1% |
| Period 5 of 2026-27 | 2,768 | 65.9% | 5.9% |
| Period 4 of 2026-27 | 2,838 | 62.3% | 8.9% |
| Period 3 of 2026-27 | 2,888 | 61.1% | 7.8% |
| Period 2 of 2026-27 | 3,080 | 65.4% | 6.5% |
| Period 1 of 2026-27 | 3,524 | 64.9% | 5.2% |
| Period 13 of 2025-26 | 3,395 | 64.1% | 5.2% |
| Period 12 of 2025-26 | 3,103 | 69.1% | 3.2% |
| Period 11 of 2025-26 | 3,079 | 72.1% | 3.2% |
| Period 10 of 2025-26 | 2,855 | 70.1% | 2.2% |
| Period 9 of 2025-26 | 3,006 | 58.5% | 3.3% |
| Period 8 of 2025-26 | 3,083 | 65.1% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Loughborough | 38,326 | 65.2% | 4.7% |
| Newark Northgate | 33,650 | 69.0% | 2.8% |
| Northampton | 33,593 | 68.9% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out