North Dulwich
NDLLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
North Dulwich had 46,138 scheduled stops to Period 7 of 2026-27, about 127 a day. 95.2% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
North Dulwich opened on 1 October 1868, 158 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, North Dulwich is the newest; the oldest, Herne Hill, opened in 1862.
The nearest stations to North Dulwich are East Dulwich (0.9 km north-east), Herne Hill (1.0 km west), West Dulwich (1.5 km south), Denmark Hill (1.6 km north) and Loughborough Junction (1.6 km north-west). 125 stations lie within 10 km in all. Of the five, East Dulwich is the most punctual at 96.0% and Herne Hill the least at 81.3%, with North Dulwich on 95.2%.
In London, North Dulwich ranks 12th of 332 ranked stations. Its 95.2% is 6.4 percentage points better than the area median of 88.8%.
GTR is the only operator serving North Dulwich. Here it manages 95.2% within three minutes, 12.3 percentage points better than its 82.9% across its whole network.
1 of 3 stations of a similar size in London are more punctual than North Dulwich on 95.2%. The comparison group includes East Dulwich (96.0%), South Bermondsey (94.1%) and Streatham Hill (94.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 46,138 | 95.2% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at North Dulwich? Delay Repay
These operators call at North Dulwich and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,644 | 92.7% | 2.9% |
| Period 6 of 2026-27 | 3,037 | 90.7% | 3.1% |
| Period 5 of 2026-27 | 3,645 | 93.3% | 4.2% |
| Period 4 of 2026-27 | 3,644 | 95.6% | 2.5% |
| Period 3 of 2026-27 | 3,519 | 95.5% | 2.2% |
| Period 2 of 2026-27 | 3,566 | 96.1% | 3.4% |
| Period 1 of 2026-27 | 4,134 | 96.2% | 1.8% |
| Period 13 of 2025-26 | 3,932 | 96.6% | 3.5% |
| Period 12 of 2025-26 | 3,581 | 96.3% | 2.7% |
| Period 11 of 2025-26 | 3,396 | 95.8% | 2.0% |
| Period 10 of 2025-26 | 2,809 | 94.5% | 3.1% |
| Period 9 of 2025-26 | 3,581 | 97.1% | 0.3% |
| Period 8 of 2025-26 | 3,650 | 95.7% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Dulwich | 46,138 | 96.0% | 2.6% |
| South Bermondsey | 45,387 | 94.1% | 2.5% |
| Streatham Hill | 45,371 | 94.2% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out