East Dulwich
EDWLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
East Dulwich had 46,138 scheduled stops to Period 7 of 2026-27, about 127 a day. 96.0% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
East Dulwich opened on 1 October 1868, 158 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, East Dulwich is the newest; the oldest, Herne Hill, opened in 1862.
The nearest stations to East Dulwich are North Dulwich (0.9 km south-west), Denmark Hill (1.0 km north-west), Peckham Rye (1.3 km north-east), Loughborough Junction (1.6 km west) and Herne Hill (1.7 km south-west). 134 stations lie within 10 km in all. At 96.0%, East Dulwich is more punctual than every one of them; the best of the five, North Dulwich, manages 95.2%.
East Dulwich takes its name from an area of London called East Dulwich, home to about 12,321 people, and the station stands 0.2 km from its centre.
East Dulwich is among the most punctual stations in Britain. Its 96.0% puts it 76th out of 2,374 ranked stations, with 75 ahead of it and 2,298 behind, and 12.1 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in London, East Dulwich is the most punctual, at 96.0%. The comparison group includes North Dulwich (95.2%), South Bermondsey (94.1%) and Streatham Hill (94.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 46,138 | 96.0% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at East Dulwich? Delay Repay
These operators call at East Dulwich and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,644 | 94.5% | 2.9% |
| Period 6 of 2026-27 | 3,037 | 93.3% | 3.1% |
| Period 5 of 2026-27 | 3,645 | 94.2% | 4.2% |
| Period 4 of 2026-27 | 3,644 | 96.1% | 2.5% |
| Period 3 of 2026-27 | 3,519 | 96.3% | 2.2% |
| Period 2 of 2026-27 | 3,566 | 96.6% | 3.4% |
| Period 1 of 2026-27 | 4,134 | 96.6% | 1.8% |
| Period 13 of 2025-26 | 3,932 | 97.0% | 3.5% |
| Period 12 of 2025-26 | 3,581 | 96.8% | 2.7% |
| Period 11 of 2025-26 | 3,396 | 96.5% | 2.0% |
| Period 10 of 2025-26 | 2,809 | 95.4% | 3.1% |
| Period 9 of 2025-26 | 3,581 | 97.6% | 0.3% |
| Period 8 of 2025-26 | 3,650 | 96.2% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| North Dulwich | 46,138 | 95.2% | 2.6% |
| South Bermondsey | 45,387 | 94.1% | 2.5% |
| Streatham Hill | 45,371 | 94.2% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out