South Bermondsey
SBMLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
South Bermondsey had 45,387 scheduled stops to Period 7 of 2026-27, about 125 a day. 94.1% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
South Bermondsey opened on 13 August 1866. It was moved to the site it uses now on 17 June 1928. The First World War closed South Bermondsey on 1 January 1917, and it reopened on 1 May 1919. Among the 5 stations nearest to it with a known opening date, New Cross Gate is the oldest (1839) and Canada Water the newest (1999), with South Bermondsey in between.
The nearest stations to South Bermondsey are Surrey Quays (0.8 km north-east), Canada Water (1.2 km north), Rotherhithe (1.4 km north), Queens Road (Peckham) (1.6 km south) and New Cross Gate (1.7 km south-east). 141 stations lie within 10 km in all. At 94.1%, South Bermondsey is more punctual than every one of them; the best of the five, Surrey Quays, manages 91.7%.
South Bermondsey is one of 2 stations named after a quarter called South Bermondsey; this one stands 0.0 km from its centre.
1 of 3 stations of a similar size in London are more punctual than South Bermondsey on 94.1%. The comparison group includes Streatham Hill (94.2%), Kent House (85.3%) and Penge East (84.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 45,387 | 94.1% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at South Bermondsey? Delay Repay
These operators call at South Bermondsey and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,625 | 91.0% | 2.9% |
| Period 6 of 2026-27 | 3,026 | 89.6% | 3.0% |
| Period 5 of 2026-27 | 3,635 | 91.2% | 4.2% |
| Period 4 of 2026-27 | 3,624 | 94.8% | 2.5% |
| Period 3 of 2026-27 | 3,499 | 93.7% | 2.1% |
| Period 2 of 2026-27 | 3,549 | 95.2% | 3.4% |
| Period 1 of 2026-27 | 4,139 | 95.2% | 1.8% |
| Period 13 of 2025-26 | 3,916 | 96.2% | 3.5% |
| Period 12 of 2025-26 | 3,567 | 95.8% | 2.7% |
| Period 11 of 2025-26 | 3,401 | 95.7% | 2.0% |
| Period 10 of 2025-26 | 2,198 | 92.7% | 2.5% |
| Period 9 of 2025-26 | 3,567 | 96.1% | 0.3% |
| Period 8 of 2025-26 | 3,641 | 94.8% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Streatham Hill | 45,371 | 94.2% | 3.0% |
| Kent House | 44,792 | 85.3% | 2.5% |
| Penge East | 44,750 | 84.5% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out