Nitshill
NITScotlandManaged by ScotRail
How this station is performing
Nitshill had 20,227 scheduled stops to Period 7 of 2026-27, about 56 a day. 94.5% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Nitshill opened on 27 September 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Nitshill is the oldest; the next oldest, Kennishead, dates from 1848.
The nearest stations to Nitshill are Priesthill and Darnley (1.1 km east), Kennishead (2.2 km east), Barrhead (2.5 km west), Patterton (2.8 km south-east) and Thornliebank (3.0 km east). 60 stations lie within 10 km in all. Of the five, Patterton is the most punctual at 96.6% and Barrhead the least at 91.2%, with Nitshill on 94.5%.
In Scotland, Nitshill ranks 38th of 313 ranked stations. Its 94.5% is 6.8 percentage points better than the area median of 87.7%.
Across the whole run of data, the weakest four-week period for Nitshill was Period 9 of 2024-25, at 88.0%, some time before the latest year. The strongest was Period 6 of 2026-27, at 97.0%, and the two are 9.0 percentage points apart.
1 of 3 stations of a similar size in Scotland are more punctual than Nitshill on 94.5%. The comparison group includes Kennishead (93.5%), Priesthill and Darnley (92.9%) and Dumbreck (95.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 20,227 | 94.5% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Nitshill? Delay Repay
These operators call at Nitshill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,592 | 96.3% | 1.1% |
| Period 6 of 2026-27 | 1,592 | 97.0% | 0.4% |
| Period 5 of 2026-27 | 1,592 | 94.4% | 0.7% |
| Period 4 of 2026-27 | 1,592 | 94.0% | 1.8% |
| Period 3 of 2026-27 | 1,592 | 94.7% | 4.6% |
| Period 2 of 2026-27 | 1,500 | 95.9% | 1.7% |
| Period 1 of 2026-27 | 1,832 | 94.3% | 1.9% |
| Period 13 of 2025-26 | 1,207 | 95.4% | 1.0% |
| Period 12 of 2025-26 | 1,584 | 96.6% | 0.2% |
| Period 11 of 2025-26 | 1,584 | 95.5% | 0.9% |
| Period 10 of 2025-26 | 1,390 | 90.8% | 1.0% |
| Period 9 of 2025-26 | 1,586 | 90.8% | 3.5% |
| Period 8 of 2025-26 | 1,584 | 92.6% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kennishead | 20,227 | 93.5% | 1.6% |
| Priesthill and Darnley | 20,227 | 92.9% | 1.6% |
| Dumbreck | 20,240 | 95.9% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out