Dumbreck
DUMScotlandManaged by ScotRail
How this station is performing
Dumbreck had 20,240 scheduled stops to Period 7 of 2026-27, about 56 a day. 95.9% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Dumbreck opened on 30 July 1990, 36 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dumbreck is the newest; the oldest, Pollokshields East, opened in 1886.
The nearest stations to Dumbreck are Maxwell Park (1.1 km south-east), Crossmyloof (1.6 km south-east), Pollokshields West (1.7 km south-east), Shawlands (1.8 km south) and Pollokshields East (2.0 km east). 80 stations lie within 10 km in all. At 95.9%, Dumbreck is more punctual than every one of them; the best of the five, Crossmyloof, manages 95.8%.
Dumbreck is among the most punctual stations in Britain. Its 95.9% puts it 87th out of 2,374 ranked stations, with 86 ahead of it and 2,287 behind, and 12.0 percentage points above the national median of 83.9%.
In Scotland, Dumbreck ranks 22nd of 313 ranked stations. Its 95.9% is 8.2 percentage points better than the area median of 87.7%.
Compared with 3 stations of a similar size in Scotland, Dumbreck is the most punctual, at 95.9%. The comparison group includes Kennishead (93.5%), Nitshill (94.5%) and Priesthill and Darnley (92.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 20,240 | 95.9% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Dumbreck? Delay Repay
These operators call at Dumbreck and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,624 | 96.4% | 0.6% |
| Period 6 of 2026-27 | 1,624 | 98.0% | 0.4% |
| Period 5 of 2026-27 | 1,624 | 97.6% | 0.6% |
| Period 4 of 2026-27 | 1,517 | 95.7% | 0.9% |
| Period 3 of 2026-27 | 1,628 | 97.0% | 1.6% |
| Period 2 of 2026-27 | 1,624 | 93.8% | 1.1% |
| Period 1 of 2026-27 | 1,880 | 96.0% | 2.2% |
| Period 13 of 2025-26 | 832 | 97.4% | 1.3% |
| Period 12 of 2025-26 | 1,624 | 96.0% | 0.6% |
| Period 11 of 2025-26 | 1,624 | 96.4% | 0.5% |
| Period 10 of 2025-26 | 1,388 | 95.4% | 1.1% |
| Period 9 of 2025-26 | 1,627 | 93.8% | 4.1% |
| Period 8 of 2025-26 | 1,624 | 93.8% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kennishead | 20,227 | 93.5% | 1.6% |
| Nitshill | 20,227 | 94.5% | 1.6% |
| Priesthill and Darnley | 20,227 | 92.9% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out