Ninian Park
NNPWalesManaged by TfW Rail
How this station is performing
Ninian Park had 22,300 scheduled stops to Period 7 of 2026-27, about 61 a day. 92.7% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Ninian Park opened on 2 November 1912 and closed to passengers on 3 September 1939. It reopened on 4 October 1987, 39 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Cardiff Queen Street is the oldest (1840) and Waun-gron Park the newest (1987), with Ninian Park in between.
The nearest stations to Ninian Park are Grangetown (Cardiff) (1.4 km south-east), Cardiff Central (1.5 km east), Cathays (2.1 km north-east), Cardiff Queen Street (2.2 km east) and Waun-gron Park (2.4 km north-west). 27 stations lie within 10 km in all. Of the five, Cardiff Queen Street is the most punctual at 94.9% and Cardiff Central the least at 83.5%, with Ninian Park on 92.7%.
Ninian Park has edged up: 92.7% of stops came within three minutes of the timetable in the latest 13 periods, 4.5 percentage points better than the 88.2% of the 13 before. Cancellations fell to 2.3% of scheduled stops from 2.8%, which is 0.5 percentage points fewer.
Compared with 3 stations of a similar size in Wales, Ninian Park is the least punctual, at 92.7%. All of them are ahead, including Merthyr Tydfil (98.0%), Quakers Yard (94.5%) and Merthyr Vale (96.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 22,300 | 92.7% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Ninian Park? Delay Repay
These operators call at Ninian Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,704 | 92.8% | 3.6% |
| Period 6 of 2026-27 | 1,704 | 91.5% | 4.2% |
| Period 5 of 2026-27 | 1,710 | 92.1% | 2.2% |
| Period 4 of 2026-27 | 1,689 | 91.1% | 2.1% |
| Period 3 of 2026-27 | 1,708 | 92.8% | 3.1% |
| Period 2 of 2026-27 | 1,700 | 94.6% | 2.9% |
| Period 1 of 2026-27 | 1,977 | 95.2% | 1.7% |
| Period 13 of 2025-26 | 1,877 | 95.9% | 0.9% |
| Period 12 of 2025-26 | 1,720 | 94.5% | 1.3% |
| Period 11 of 2025-26 | 1,686 | 94.8% | 1.4% |
| Period 10 of 2025-26 | 1,535 | 89.7% | 2.8% |
| Period 9 of 2025-26 | 1,693 | 89.6% | 1.4% |
| Period 8 of 2025-26 | 1,597 | 88.7% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merthyr Tydfil | 21,711 | 98.0% | 2.2% |
| Quakers Yard | 21,677 | 94.5% | 1.6% |
| Merthyr Vale | 21,675 | 96.0% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out