Merthyr Vale
MEVWalesManaged by TfW Rail
How this station is performing
Merthyr Vale had 21,675 scheduled stops to Period 7 of 2026-27, about 60 a day. 96.0% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Merthyr Vale opened on 1 June 1883, 143 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Troed-y-rhiw is the oldest (1841) and Fernhill the newest (1988), with Merthyr Vale in between.
The nearest stations to Merthyr Vale are Penrhiwceiber (2.4 km south-west), Mountain Ash (2.8 km west), Troed-y-rhiw (2.9 km north), Quakers Yard (3.0 km south) and Fernhill (4.1 km west). 23 stations lie within 10 km in all. At 96.0%, Merthyr Vale is more punctual than every one of them; the best of the five, Troed-y-rhiw, manages 95.2%.
Merthyr Vale takes its name from a Village called Merthyr Vale, home to about 3,925 people, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Merthyr Vale was Period 3 of 2023-24, at 77.2%, some time before the latest year. The strongest was Period 13 of 2025-26, at 98.2%, and the two are 21.0 percentage points apart. Cancellations peaked at 16.9% of scheduled stops in Period 3 of 2023-24, against 1.8% over the latest 13 periods.
1 of 3 stations of a similar size in Wales are more punctual than Merthyr Vale on 96.0%. The comparison group includes Pentre-Bach (97.2%), Troed-y-rhiw (95.2%) and Quakers Yard (94.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 21,675 | 96.0% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Merthyr Vale? Delay Repay
These operators call at Merthyr Vale and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,673 | 95.6% | 2.5% |
| Period 6 of 2026-27 | 1,694 | 94.4% | 4.2% |
| Period 5 of 2026-27 | 1,138 | 94.1% | 1.2% |
| Period 4 of 2026-27 | 1,670 | 95.3% | 1.3% |
| Period 3 of 2026-27 | 1,701 | 96.2% | 3.2% |
| Period 2 of 2026-27 | 1,695 | 96.7% | 3.1% |
| Period 1 of 2026-27 | 1,961 | 97.8% | 0.8% |
| Period 13 of 2025-26 | 1,859 | 98.2% | 0.9% |
| Period 12 of 2025-26 | 1,698 | 96.5% | 1.1% |
| Period 11 of 2025-26 | 1,677 | 96.7% | 1.3% |
| Period 10 of 2025-26 | 1,520 | 94.8% | 1.4% |
| Period 9 of 2025-26 | 1,697 | 94.6% | 1.0% |
| Period 8 of 2025-26 | 1,692 | 96.0% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pentre-Bach | 21,675 | 97.2% | 2.4% |
| Troed-y-rhiw | 21,675 | 95.2% | 2.3% |
| Quakers Yard | 21,677 | 94.5% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out