Quakers Yard
QYDWalesManaged by TfW Rail
How this station is performing
Quakers Yard had 21,677 scheduled stops to Period 7 of 2026-27, about 60 a day. 94.5% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Quakers Yard opened on 5 January 1858, 168 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Abercynon is the oldest (1840) and Fernhill the newest (1988), with Quakers Yard in between.
The nearest stations to Quakers Yard are Abercynon (2.1 km south), Penrhiwceiber (2.8 km west), Merthyr Vale (3.0 km north), Mountain Ash (4.4 km north-west) and Fernhill (5.8 km north-west). 24 stations lie within 10 km in all. Of the five, Merthyr Vale is the most punctual at 96.0% and Penrhiwceiber the least at 89.6%, with Quakers Yard on 94.5%.
Quakers Yard takes its name from a Village called Quakers Yard, and the station stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Quakers Yard was Period 9 of 2024-25, at 82.1%, some time before the latest year. The strongest was Period 13 of 2025-26, at 97.5%, and the two are 15.4 percentage points apart. Cancellations peaked at 13.4% of scheduled stops in Period 1 of 2023-24, against 1.6% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Quakers Yard is the least punctual, at 94.5%. All of them are ahead, including Merthyr Vale (96.0%), Pentre-Bach (97.2%) and Troed-y-rhiw (95.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 21,677 | 94.5% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Quakers Yard? Delay Repay
These operators call at Quakers Yard and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,673 | 92.9% | 2.6% |
| Period 6 of 2026-27 | 1,694 | 91.9% | 3.4% |
| Period 5 of 2026-27 | 1,138 | 92.1% | 1.5% |
| Period 4 of 2026-27 | 1,670 | 92.6% | 1.1% |
| Period 3 of 2026-27 | 1,701 | 94.6% | 3.2% |
| Period 2 of 2026-27 | 1,695 | 95.7% | 3.2% |
| Period 1 of 2026-27 | 1,961 | 96.7% | 0.7% |
| Period 13 of 2025-26 | 1,859 | 97.5% | 0.9% |
| Period 12 of 2025-26 | 1,698 | 94.6% | 1.1% |
| Period 11 of 2025-26 | 1,679 | 95.2% | 1.0% |
| Period 10 of 2025-26 | 1,520 | 94.1% | 0.9% |
| Period 9 of 2025-26 | 1,697 | 93.4% | 1.1% |
| Period 8 of 2025-26 | 1,692 | 94.9% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merthyr Vale | 21,675 | 96.0% | 1.8% |
| Pentre-Bach | 21,675 | 97.2% | 2.4% |
| Troed-y-rhiw | 21,675 | 95.2% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out