Merthyr Tydfil
MERWalesManaged by TfW Rail
How this station is performing
Merthyr Tydfil had 21,711 scheduled stops to Period 7 of 2026-27, about 60 a day. 98.0% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Merthyr Tydfil opened on 2 November 1853. It was moved to the site it uses now on 14 January 1996. Among the 5 stations nearest to it with a known opening date, Troed-y-rhiw is the oldest (1841) and Aberdare the newest (1988), with Merthyr Tydfil in between.
The nearest stations to Merthyr Tydfil are Pentre-Bach (2.4 km south-east), Troed-y-rhiw (4.2 km south-east), Cwmbach (5.4 km south-west), Aberdare (5.5 km south-west) and Rhymney (6.3 km east). 11 stations lie within 10 km in all. At 98.0%, Merthyr Tydfil is more punctual than every one of them; the best of the five, Pentre-Bach, manages 97.2%.
Merthyr Tydfil takes its name from a town called Merthyr Tydfil, home to about 58,839 people, and the station stands 0.3 km from its centre.
Merthyr Tydfil is among the most punctual stations in Britain. Its 98.0% puts it 17th out of 2,374 ranked stations, with 16 ahead of it and 2,357 behind, and 14.1 percentage points above the national median of 83.9%.
Compared with 3 stations of a similar size in Wales, Merthyr Tydfil is the most punctual, at 98.0%. The comparison group includes Quakers Yard (94.5%), Merthyr Vale (96.0%) and Pentre-Bach (97.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 21,711 | 98.0% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Merthyr Tydfil? Delay Repay
These operators call at Merthyr Tydfil and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,673 | 97.7% | 2.8% |
| Period 6 of 2026-27 | 1,694 | 98.0% | 4.7% |
| Period 5 of 2026-27 | 1,138 | 97.1% | 1.8% |
| Period 4 of 2026-27 | 1,704 | 98.0% | 1.9% |
| Period 3 of 2026-27 | 1,701 | 98.0% | 3.8% |
| Period 2 of 2026-27 | 1,697 | 98.8% | 3.4% |
| Period 1 of 2026-27 | 1,961 | 99.1% | 1.0% |
| Period 13 of 2025-26 | 1,859 | 99.1% | 1.1% |
| Period 12 of 2025-26 | 1,698 | 98.5% | 1.3% |
| Period 11 of 2025-26 | 1,677 | 98.1% | 1.4% |
| Period 10 of 2025-26 | 1,520 | 96.8% | 2.1% |
| Period 9 of 2025-26 | 1,697 | 96.3% | 1.1% |
| Period 8 of 2025-26 | 1,692 | 98.0% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Quakers Yard | 21,677 | 94.5% | 1.6% |
| Merthyr Vale | 21,675 | 96.0% | 1.8% |
| Pentre-Bach | 21,675 | 97.2% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out