Newtongrange
NEGScotlandManaged by ScotRail
How this station is performing
Newtongrange had 21,121 scheduled stops to Period 7 of 2026-27, about 58 a day. 90.9% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Newtongrange opened on 6 September 2015. It was moved to the site it uses now on 1 August 1908. Of the 5 stations nearest to it with a known opening date, Newtongrange is the newest; the oldest, Gorebridge, opened in 1847.
The nearest stations to Newtongrange are Eskbank (2.0 km north-west), Gorebridge (3.1 km south-east), Shawfair (6.0 km north), Musselburgh (7.7 km north) and Newcraighall (7.7 km north). 7 stations lie within 10 km in all. At 90.9%, Newtongrange is more punctual than every one of them; the best of the five, Newcraighall, manages 89.9%.
Newtongrange takes its name from a Village called Newtongrange, home to about 5,341 people, and the station stands 0.4 km from its centre.
The time of year matters a great deal for Newtongrange. Averaged over every railway year in the data, period 5 (late July and August) is the weakest at 82.9%, while period 12 (February) is the strongest at 93.9%, a spread of 11.0 percentage points.
Compared with 3 stations of a similar size in Scotland, Newtongrange is the most punctual, at 90.9%. The comparison group includes Eskbank (87.8%), Galashiels (89.1%) and Gorebridge (89.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 21,121 | 90.9% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Newtongrange? Delay Repay
These operators call at Newtongrange and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,600 | 89.1% | 1.1% |
| Period 6 of 2026-27 | 1,608 | 92.4% | 2.1% |
| Period 5 of 2026-27 | 1,615 | 83.1% | 1.7% |
| Period 4 of 2026-27 | 1,600 | 82.1% | 2.6% |
| Period 3 of 2026-27 | 1,600 | 88.5% | 1.3% |
| Period 2 of 2026-27 | 1,613 | 93.6% | 1.2% |
| Period 1 of 2026-27 | 1,878 | 92.8% | 1.0% |
| Period 13 of 2025-26 | 1,689 | 94.8% | 2.7% |
| Period 12 of 2025-26 | 1,632 | 95.9% | 0.7% |
| Period 11 of 2025-26 | 1,632 | 90.7% | 0.9% |
| Period 10 of 2025-26 | 1,390 | 89.4% | 1.5% |
| Period 9 of 2025-26 | 1,632 | 93.3% | 1.8% |
| Period 8 of 2025-26 | 1,632 | 94.9% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Eskbank | 21,121 | 87.8% | 1.4% |
| Galashiels | 21,121 | 89.1% | 1.5% |
| Gorebridge | 21,121 | 89.8% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out