Netley
NTLSouth EastManaged by South Western Railway
How this station is performing
Netley had 14,729 scheduled stops to Period 7 of 2026-27, about 40 a day. 79.2% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Netley opened on 5 March 1866, 160 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Netley is the oldest; the next oldest, Sholing, dates from 1866.
The nearest stations to Netley are Hamble (1.0 km south-east), Bursledon (2.8 km east), Sholing (2.9 km north-west), Woolston (3.6 km north-west) and Swanwick (5.3 km east). 13 stations lie within 10 km in all. Of the five, Woolston is the most punctual at 80.7% and Swanwick the least at 77.5%, with Netley on 79.2%.
Netley takes its name from a Village called Netley, and the station stands 0.8 km from its centre.
Netley has slipped sharply. 79.2% of stops came within three minutes of the timetable in the latest 13 periods, 7.1 percentage points worse than the 86.3% recorded in the 13 before. Cancellations held steady at 2.3% of scheduled stops, against 1.9% before.
1 of 3 stations of a similar size in South East are more punctual than Netley on 79.2%. The comparison group includes Sturry (78.5%), Bookham (81.7%) and Swaythling (75.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 14,239 | 79.4% | 2.2% |
| GTR | 490 | – | – |
Operators with their own page for this station are linked to it.
Late train at Netley? Delay Repay
These operators call at Netley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,145 | 65.5% | 2.4% |
| Period 6 of 2026-27 | 1,062 | 56.2% | 2.0% |
| Period 5 of 2026-27 | 1,148 | 75.5% | 1.2% |
| Period 4 of 2026-27 | 1,113 | 79.1% | 1.8% |
| Period 3 of 2026-27 | 1,128 | 80.2% | 3.8% |
| Period 2 of 2026-27 | 1,128 | 78.6% | 4.6% |
| Period 1 of 2026-27 | 1,304 | 85.8% | 2.0% |
| Period 13 of 2025-26 | 1,253 | 87.3% | 0.9% |
| Period 12 of 2025-26 | 1,055 | 87.3% | 2.6% |
| Period 11 of 2025-26 | 1,144 | 88.8% | 2.4% |
| Period 10 of 2025-26 | 985 | 84.8% | 2.4% |
| Period 9 of 2025-26 | 1,142 | 77.6% | 1.4% |
| Period 8 of 2025-26 | 1,122 | 80.5% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sturry | 14,850 | 78.5% | 1.0% |
| Bookham | 14,516 | 81.7% | 3.1% |
| Swaythling | 15,013 | 75.4% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out