Swaythling
SWGSouth EastManaged by South Western Railway
How this station is performing
Swaythling had 15,013 scheduled stops to Period 7 of 2026-27, about 41 a day. 75.4% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Swaythling opened on 15 October 1883, 143 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Eastleigh is the oldest (1839) and Southampton Airport Parkway the newest (1929), with Swaythling in between.
The nearest stations to Swaythling are Southampton Airport Parkway (1.4 km north-east), St Denys (2.3 km south), Bitterne (2.6 km south), Eastleigh (3.5 km north-east) and Southampton Central (4.5 km south-west). 18 stations lie within 10 km in all. Of the five, Bitterne is the most punctual at 77.5% and Southampton Airport Parkway the least at 67.0%, with Swaythling on 75.4%.
Swaythling takes its name from a suburb called Swaythling, home to about 13,664 people, and the station stands 0.3 km from its centre.
Swaythling has slipped sharply. 75.4% of stops came within three minutes of the timetable in the latest 13 periods, 5.3 percentage points worse than the 80.7% recorded in the 13 before. Cancellations rose to 2.5% of scheduled stops from 1.9%, which is 0.6 percentage points more.
1 of 3 stations of a similar size in South East are more punctual than Swaythling on 75.4%. The comparison group includes Sturry (78.5%), Ashurst New Forest (71.6%) and Warblington (75.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 15,013 | 75.4% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Swaythling? Delay Repay
These operators call at Swaythling and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,100 | 71.7% | 1.1% |
| Period 6 of 2026-27 | 1,186 | 74.9% | 0.6% |
| Period 5 of 2026-27 | 1,193 | 63.9% | 1.4% |
| Period 4 of 2026-27 | 1,195 | 65.8% | 3.2% |
| Period 3 of 2026-27 | 1,160 | 78.1% | 4.3% |
| Period 2 of 2026-27 | 1,150 | 77.3% | 4.1% |
| Period 1 of 2026-27 | 1,143 | 80.4% | 1.1% |
| Period 13 of 2025-26 | 1,254 | 84.9% | 1.6% |
| Period 12 of 2025-26 | 1,027 | 80.0% | 2.3% |
| Period 11 of 2025-26 | 1,193 | 82.6% | 4.6% |
| Period 10 of 2025-26 | 1,021 | 81.0% | 3.4% |
| Period 9 of 2025-26 | 1,195 | 69.8% | 2.3% |
| Period 8 of 2025-26 | 1,196 | 72.6% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sturry | 14,850 | 78.5% | 1.0% |
| Ashurst New Forest | 15,184 | 71.6% | 5.9% |
| Warblington | 15,213 | 75.1% | 6.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out