Bookham had 14,516 scheduled stops to Period 7 of 2026-27, about 40 a day. 81.7% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Bookham opened on 2 February 1885, 141 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Leatherhead is the oldest (1867) and Effingham Junction the newest (1888), with Bookham in between.
The nearest stations to Bookham are Effingham Junction (2.5 km west), Cobham and Stoke D'abernon (3.3 km north), Leatherhead (3.7 km east), Horsley (3.7 km west) and Box Hill and Westhumble (5.5 km south-east). 20 stations lie within 10 km in all. At 81.7%, Bookham is less punctual than all of them; the best of the five, Box Hill and Westhumble, manages 88.0%.
Bookham is named after Little Bookham, a Village, home to about 11,375 people, but the station stands 1.0 km from its centre.
Across the whole run of data, the weakest four-week period for Bookham was Period 9 of 2024-25, at 62.8%, some time before the latest year. The strongest was Period 5 of 2023-24, at 93.1%, and the two are 30.3 percentage points apart. Cancellations peaked at 6.8% of scheduled stops in Period 9 of 2024-25, against 3.1% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Bookham is the most punctual, at 81.7%. The comparison group includes Charlbury (60.9%), Kingham (56.7%) and Netley (79.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 14,516 | 81.7% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Bookham? Delay Repay
These operators call at Bookham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,127 | 92.8% | 2.4% |
| Period 6 of 2026-27 | 1,088 | 85.6% | 2.3% |
| Period 5 of 2026-27 | 1,032 | 87.5% | 4.3% |
| Period 4 of 2026-27 | 1,130 | 86.9% | 1.2% |
| Period 3 of 2026-27 | 1,109 | 83.7% | 3.4% |
| Period 2 of 2026-27 | 1,084 | 80.9% | 4.3% |
| Period 1 of 2026-27 | 1,251 | 85.5% | 3.9% |
| Period 13 of 2025-26 | 1,223 | 83.5% | 1.3% |
| Period 12 of 2025-26 | 1,133 | 82.0% | 3.3% |
| Period 11 of 2025-26 | 1,132 | 77.8% | 1.2% |
| Period 10 of 2025-26 | 976 | 77.5% | 5.0% |
| Period 9 of 2025-26 | 1,100 | 66.4% | 3.5% |
| Period 8 of 2025-26 | 1,131 | 70.6% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East