LNER at Morpeth
How this operator is doing here
LNER had 3,406 scheduled stops at Morpeth in the 13 periods to Period 7 of 2026-27, 12% of the station's total. 69.4% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
LNER trains at Morpeth also serve Newcastle (22.0 km south, 63.7% on time, 2.3% cancelled), Alnmouth (25.7 km north, 62.9% on time, 1.7% cancelled), Durham (43.1 km south, 68.1% on time, 2.4% cancelled), Middlesbrough (70.9 km south-east, – on time, – cancelled), Berwick-upon-Tweed (71.1 km north, 64.2% on time, 1.2% cancelled) and Thornaby (71.4 km south, – on time, – cancelled), which are the stations on its network closest to Morpeth.
The busiest LNER station within 30 km of Morpeth is Newcastle, 22.0 km south, with about 92 scheduled stops a day.
LNER ranks 3rd of the 5 operators with enough records at Morpeth, on 69.4%.
For LNER, Morpeth is the 13th best of 35 ranked stations. Its 69.4% here is 1.8 percentage points above the 67.6% across the whole network.
LNER at Morpeth has slipped sharply. 69.4% of stops came within three minutes of the timetable in the latest 13 periods, 6.0 percentage points worse than the 75.4% recorded in the 13 before. Cancellations held steady at 1.6% of scheduled stops, against 1.6% before.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 216 | 63.7% | 0.5% |
| Period 6 of 2026-27 | 242 | 68.5% | 1.7% |
| Period 5 of 2026-27 | 253 | 64.8% | 1.2% |
| Period 4 of 2026-27 | 248 | 69.8% | 1.2% |
| Period 3 of 2026-27 | 252 | 71.1% | 2.4% |
| Period 2 of 2026-27 | 249 | 66.7% | 1.2% |
| Period 1 of 2026-27 | 286 | 67.4% | 2.4% |
| Period 13 of 2025-26 | 273 | 76.7% | 1.1% |
| Period 12 of 2025-26 | 253 | 69.6% | 1.2% |
| Period 11 of 2025-26 | 252 | 69.1% | 2.4% |
| Period 10 of 2025-26 | 240 | 70.8% | 0.0% |
| Period 9 of 2025-26 | 321 | 69.6% | 3.7% |
| Period 8 of 2025-26 | 321 | 72.2% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Morpeth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,346 | 83.3% | 2.3% |
| TransPennine Express | 5,360 | 70.1% | 1.8% |
| CrossCountry | 4,562 | 64.6% | 3.2% |
| Lumo (East Coast) | 3,372 | 57.8% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out