Northern had 12,346 scheduled stops at Morpeth in the 13 periods to Period 7 of 2026-27, 43% of the station's total. 83.3% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
Northern trains at Morpeth also serve Pegswood (3.0 km north-east, 66.4% on time, 0.2% cancelled), Ashington (7.3 km east, 82.1% on time, 2.6% cancelled), Widdrington (9.7 km north-east, 66.5% on time, 0.2% cancelled), Cramlington (9.9 km south-east, 83.9% on time, 2.3% cancelled), Newsham (12.1 km south-east, 82.6% on time, 2.2% cancelled) and Seaton Delaval (13.4 km south-east, 80.9% on time, 2.1% cancelled), which are the stations on its network closest to Morpeth.
Within 30 km of here, Northern runs best at Dunston, 23.8 km south (87.0%), and worst at Seaton Delaval, 13.4 km south-east (80.9%).
The busiest Northern station within 30 km of Morpeth is Newcastle, 22.0 km south, with about 208 scheduled stops a day.
Of the 5 operators with enough records at Morpeth, Northern is the most punctual, at 83.3%.
For Northern, Morpeth is the 159th best of 493 ranked stations. Its 83.3% here is 4.7 percentage points above the 78.6% across the whole network.
Over three full railway years Northern at Morpeth has got worse each time, from 85.4% within three minutes in 2023-24 to 84.5% in 2024-25 and 83.9% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 820 | 83.3% | 1.5% |
| Period 6 of 2026-27 | 940 | 84.6% | 2.3% |
| Period 5 of 2026-27 | 976 | 81.2% | 2.8% |
| Period 4 of 2026-27 | 976 | 82.1% | 3.3% |
| Period 3 of 2026-27 | 976 | 84.5% | 1.7% |
| Period 2 of 2026-27 | 976 | 86.2% | 3.5% |
| Period 1 of 2026-27 | 1,120 | 83.5% | 0.7% |
| Period 13 of 2025-26 | 1,076 | 86.1% | 2.1% |
| Period 12 of 2025-26 | 976 | 88.7% | 1.2% |
| Period 11 of 2025-26 | 972 | 85.8% | 3.0% |
| Period 10 of 2025-26 | 826 | 78.4% | 5.8% |
| Period 9 of 2025-26 | 856 | 76.2% | 1.2% |
| Period 8 of 2025-26 | 856 | 79.9% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Morpeth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 5,360 | 70.1% | 1.8% |
| CrossCountry | 4,562 | 64.6% | 3.2% |
| LNER | 3,406 | 69.4% | 1.6% |
| Lumo (East Coast) | 3,372 | 57.8% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out