Hackbridge
HCBLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
Hackbridge had 50,558 scheduled stops to Period 7 of 2026-27, about 139 a day. 87.8% of recorded arrivals were within three minutes of the timetable and 5.4% of scheduled stops were cancelled.
Hackbridge opened on 1 October 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Wallington is the oldest (1847) and Carshalton Beeches the newest (1906), with Hackbridge in between.
The nearest stations to Hackbridge are Carshalton (1.4 km south-west), Mitcham Junction (1.6 km north), Wallington (2.0 km south), Carshalton Beeches (2.6 km south-west) and Waddon (2.8 km south-east). 85 stations lie within 10 km in all. At 87.8%, Hackbridge is less punctual than all of them; the best of the five, Carshalton Beeches, manages 91.3%.
Hackbridge takes its name from an area of London called Hackbridge, and the station stands 2.5 km from its centre.
Cancellations are a particular problem at Hackbridge. 5.4% of scheduled stops did not happen, 2.0 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2175th of 2,374.
Compared with 3 stations of a similar size in London, Hackbridge is the least punctual, at 87.8%. All of them are ahead, including Mitcham Junction (88.6%), Mitcham Eastfields (88.6%) and Teddington (88.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 50,558 | 87.8% | 5.4% |
Operators with their own page for this station are linked to it.
Late train at Hackbridge? Delay Repay
These operators call at Hackbridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,908 | 88.5% | 5.9% |
| Period 6 of 2026-27 | 3,961 | 87.3% | 6.5% |
| Period 5 of 2026-27 | 3,916 | 85.4% | 7.3% |
| Period 4 of 2026-27 | 3,899 | 88.8% | 3.9% |
| Period 3 of 2026-27 | 3,717 | 85.6% | 6.0% |
| Period 2 of 2026-27 | 3,622 | 87.6% | 3.2% |
| Period 1 of 2026-27 | 4,308 | 89.1% | 4.2% |
| Period 13 of 2025-26 | 4,245 | 91.0% | 5.0% |
| Period 12 of 2025-26 | 4,027 | 88.6% | 3.7% |
| Period 11 of 2025-26 | 3,945 | 85.9% | 4.8% |
| Period 10 of 2025-26 | 3,233 | 89.9% | 7.6% |
| Period 9 of 2025-26 | 3,916 | 85.9% | 8.0% |
| Period 8 of 2025-26 | 3,861 | 88.1% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Mitcham Junction | 50,556 | 88.6% | 5.4% |
| Mitcham Eastfields | 50,482 | 88.6% | 5.3% |
| Teddington | 50,344 | 88.0% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out