Pentre-Bach
PTBWalesManaged by TfW Rail
How this station is performing
Pentre-Bach had 21,675 scheduled stops to Period 7 of 2026-27, about 60 a day. 97.2% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Pentre-Bach opened on 2 August 1886, 140 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Troed-y-rhiw is the oldest (1841) and Fernhill the newest (1988), with Pentre-Bach in between.
The nearest stations to Pentre-Bach are Troed-y-rhiw (1.8 km south-east), Merthyr Tydfil (2.4 km north-west), Cwmbach (4.5 km south-west), Merthyr Vale (4.6 km south-east) and Fernhill (4.9 km south-west). 15 stations lie within 10 km in all. Of the five, Merthyr Tydfil is the most punctual at 98.0% and Fernhill the least at 92.6%, with Pentre-Bach on 97.2%.
Across the whole run of data, the weakest four-week period for Pentre-Bach was Period 3 of 2023-24, at 78.5%, some time before the latest year. The strongest was Period 1 of 2026-27, at 98.7%, and the two are 20.2 percentage points apart. Cancellations peaked at 17.5% of scheduled stops in Period 3 of 2023-24, against 2.4% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Pentre-Bach is the most punctual, at 97.2%. The comparison group includes Merthyr Vale (96.0%), Troed-y-rhiw (95.2%) and Quakers Yard (94.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 21,675 | 97.2% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Pentre-Bach? Delay Repay
These operators call at Pentre-Bach and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,673 | 96.3% | 2.9% |
| Period 6 of 2026-27 | 1,694 | 96.2% | 5.1% |
| Period 5 of 2026-27 | 1,138 | 95.7% | 2.4% |
| Period 4 of 2026-27 | 1,670 | 96.9% | 2.3% |
| Period 3 of 2026-27 | 1,701 | 97.4% | 4.2% |
| Period 2 of 2026-27 | 1,695 | 98.2% | 3.7% |
| Period 1 of 2026-27 | 1,961 | 98.7% | 1.1% |
| Period 13 of 2025-26 | 1,859 | 98.7% | 1.2% |
| Period 12 of 2025-26 | 1,698 | 97.5% | 1.4% |
| Period 11 of 2025-26 | 1,677 | 97.5% | 1.6% |
| Period 10 of 2025-26 | 1,520 | 97.2% | 2.3% |
| Period 9 of 2025-26 | 1,697 | 95.4% | 1.1% |
| Period 8 of 2025-26 | 1,692 | 96.7% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merthyr Vale | 21,675 | 96.0% | 1.8% |
| Troed-y-rhiw | 21,675 | 95.2% | 2.3% |
| Quakers Yard | 21,677 | 94.5% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out