Merryton
MEYScotlandManaged by ScotRail
How this station is performing
Merryton had 23,010 scheduled stops to Period 7 of 2026-27, about 63 a day. 81.1% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Merryton opened on 12 December 2005, 21 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Merryton is the newest; the oldest, Chatelherault, opened in 1866.
The nearest stations to Merryton are Larkhall (1.2 km south), Chatelherault (2.5 km north-west), Shieldmuir (3.4 km north), Airbles (3.8 km north) and Wishaw (4.1 km north-east). 14 stations lie within 10 km in all. Of the five, Airbles is the most punctual at 94.0% and Larkhall the least at 79.7%, with Merryton on 81.1%.
Merryton has slipped a little, from 85.5% within three minutes in the previous 13 periods to 81.1% in the latest 13, a fall of 4.4 percentage points. Cancellations fell to 3.3% of scheduled stops from 4.0%, which is 0.7 percentage points fewer.
Across the whole run of data, the weakest four-week period for Merryton was Period 8 of 2023-24, at 72.0%, some time before the latest year. The strongest was Period 5 of 2025-26, at 92.9%, and the two are 20.9 percentage points apart. Cancellations peaked at 9.2% of scheduled stops in Period 5 of 2025-26, against 3.3% over the latest 13 periods.
2 of 3 stations of a similar size in Scotland are more punctual than Merryton on 81.1%. The comparison group includes Chatelherault (81.3%), Larkhall (79.7%) and Langside (93.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 23,010 | 81.1% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Merryton? Delay Repay
These operators call at Merryton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,752 | 74.9% | 4.2% |
| Period 6 of 2026-27 | 1,752 | 83.5% | 2.6% |
| Period 5 of 2026-27 | 1,752 | 84.2% | 3.7% |
| Period 4 of 2026-27 | 1,722 | 85.0% | 4.1% |
| Period 3 of 2026-27 | 1,751 | 82.3% | 2.2% |
| Period 2 of 2026-27 | 1,752 | 82.7% | 2.3% |
| Period 1 of 2026-27 | 2,023 | 82.7% | 3.5% |
| Period 13 of 2025-26 | 1,916 | 85.2% | 2.0% |
| Period 12 of 2025-26 | 1,752 | 82.6% | 3.1% |
| Period 11 of 2025-26 | 1,752 | 82.1% | 2.6% |
| Period 10 of 2025-26 | 1,576 | 80.1% | 4.5% |
| Period 9 of 2025-26 | 1,758 | 74.1% | 4.0% |
| Period 8 of 2025-26 | 1,752 | 74.4% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chatelherault | 23,010 | 81.3% | 2.8% |
| Larkhall | 23,062 | 79.7% | 3.3% |
| Langside | 23,071 | 93.1% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out