Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Southeastern at Maze Hill

All trains at Maze HillSoutheastern across BritainLondon

On time, last 13 periods90.8%Whole station: 87.7%
Cancelled1.8%Whole station: 3.7%
Scheduled stops34,516Of 56,275 at the station

How this operator is doing here

Southeastern had 34,516 scheduled stops at Maze Hill in the 13 periods to Period 7 of 2026-27, 61% of the station's total. 90.8% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.

Southeastern trains at Maze Hill also serve Westcombe Park (1.1 km east, 91.6% on time, 1.8% cancelled), Greenwich (1.4 km west, 89.5% on time, 1.8% cancelled), Blackheath (1.9 km south, 87.6% on time, 1.8% cancelled), Charlton (2.0 km east, 88.3% on time, 1.6% cancelled), Deptford (2.2 km west, 88.0% on time, 1.9% cancelled) and Lewisham (2.3 km south-west, 87.0% on time, 1.5% cancelled), which are the stations on its network closest to Maze Hill.

Within 30 km of here, Southeastern runs best at Sundridge Park, 7.8 km south (99.4%), and worst at Sevenoaks, 26.1 km south-east (72.3%).

The busiest Southeastern station within 30 km of Maze Hill is London Bridge, 6.6 km west, with about 912 scheduled stops a day.

Of the 2 operators with enough records at Maze Hill, Southeastern is the most punctual, at 90.8%.

Southeastern at Maze Hill has not moved in one direction over three full railway years: 85.4% within three minutes in 2023-24, 92.2% in 2024-25 and 91.6% in 2025-26.

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 89.2%Period 2 of 2023-24: 87.2%Period 3 of 2023-24: 85.0%Period 4 of 2023-24: 87.7%Period 5 of 2023-24: 89.7%Period 6 of 2023-24: 88.0%Period 7 of 2023-24: 84.5%Period 8 of 2023-24: 84.4%Period 9 of 2023-24: 79.2%Period 10 of 2023-24: 80.2%Period 11 of 2023-24: 82.9%Period 12 of 2023-24: 84.2%Period 13 of 2023-24: 87.2%Period 1 of 2024-25: 87.4%Period 2 of 2024-25: 87.5%Period 3 of 2024-25: 95.2%Period 4 of 2024-25: 94.2%Period 5 of 2024-25: 93.9%Period 6 of 2024-25: 94.2%Period 7 of 2024-25: 92.8%Period 8 of 2024-25: 91.3%Period 9 of 2024-25: 86.5%Period 10 of 2024-25: 91.6%Period 11 of 2024-25: 91.9%Period 12 of 2024-25: 93.0%Period 13 of 2024-25: 93.6%Period 1 of 2025-26: 94.2%Period 2 of 2025-26: 92.4%Period 3 of 2025-26: 92.7%Period 4 of 2025-26: 90.6%Period 5 of 2025-26: 91.3%Period 6 of 2025-26: 93.1%Period 7 of 2025-26: 91.9%Period 8 of 2025-26: 89.2%Period 9 of 2025-26: 88.9%Period 10 of 2025-26: 92.2%Period 11 of 2025-26: 92.8%Period 12 of 2025-26: 91.2%Period 13 of 2025-26: 90.0%Period 1 of 2026-27: 90.7%Period 2 of 2026-27: 91.1%Period 3 of 2026-27: 88.5%Period 4 of 2026-27: 91.2%Period 5 of 2026-27: 92.1%Period 6 of 2026-27: 91.6%Period 7 of 2026-27: 91.0%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 0.9%Period 2 of 2023-24: 2.1%Period 3 of 2023-24: 2.9%Period 4 of 2023-24: 0.4%Period 5 of 2023-24: 4.5%Period 6 of 2023-24: 1.5%Period 7 of 2023-24: 2.0%Period 8 of 2023-24: 1.9%Period 9 of 2023-24: 1.3%Period 10 of 2023-24: 4.0%Period 11 of 2023-24: 1.0%Period 12 of 2023-24: 2.8%Period 13 of 2023-24: 0.8%Period 1 of 2024-25: 1.3%Period 2 of 2024-25: 2.1%Period 3 of 2024-25: 1.0%Period 4 of 2024-25: 2.4%Period 5 of 2024-25: 1.1%Period 6 of 2024-25: 1.8%Period 7 of 2024-25: 1.7%Period 8 of 2024-25: 1.8%Period 9 of 2024-25: 3.0%Period 10 of 2024-25: 2.1%Period 11 of 2024-25: 3.3%Period 12 of 2024-25: 1.2%Period 13 of 2024-25: 3.4%Period 1 of 2025-26: 1.4%Period 2 of 2025-26: 2.4%Period 3 of 2025-26: 1.1%Period 4 of 2025-26: 1.9%Period 5 of 2025-26: 2.1%Period 6 of 2025-26: 2.3%Period 7 of 2025-26: 1.8%Period 8 of 2025-26: 2.5%Period 9 of 2025-26: 1.3%Period 10 of 2025-26: 0.8%Period 11 of 2025-26: 1.5%Period 12 of 2025-26: 1.5%Period 13 of 2025-26: 1.4%Period 1 of 2026-27: 1.5%Period 2 of 2026-27: 2.4%Period 3 of 2026-27: 4.5%Period 4 of 2026-27: 2.1%Period 5 of 2026-27: 2.5%Period 6 of 2026-27: 0.8%Period 7 of 2026-27: 1.1%2023-242024-252025-262026-27

See how Southeastern Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-272,74091.0%1.1%
Period 6 of 2026-272,64591.6%0.8%
Period 5 of 2026-272,60992.1%2.5%
Period 4 of 2026-272,60891.2%2.1%
Period 3 of 2026-272,37488.5%4.5%
Period 2 of 2026-272,53691.1%2.4%
Period 1 of 2026-273,10990.7%1.5%
Period 13 of 2025-263,01090.0%1.4%
Period 12 of 2025-262,66591.2%1.5%
Period 11 of 2025-262,66392.8%1.5%
Period 10 of 2025-262,30692.2%0.8%
Period 9 of 2025-262,58988.9%1.3%
Period 8 of 2025-262,66289.2%2.5%

Time of year

75%80%85%90%95%P1: 90.5%1P2: 89.9%2P3: 91.4%3P4: 91.3%4P5: 92.0%5P6: 91.9%6P7: 90.3%7P8: 88.4%8P9: 85.1%9P10: 88.2%10P11: 89.6%11P12: 89.8%12P13: 90.5%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Maze Hill

OperatorScheduled stopsWithin 3 minCancelled
GTR21,75982.5%6.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out