GTR at Maze Hill
How this operator is doing here
GTR had 21,759 scheduled stops at Maze Hill in the 13 periods to Period 7 of 2026-27, 39% of the station's total. 82.5% of recorded arrivals came within three minutes and 6.7% of stops were cancelled.
GTR trains at Maze Hill also serve Westcombe Park (1.1 km east, 82.7% on time, 6.7% cancelled), Greenwich (1.4 km west, 81.9% on time, 6.7% cancelled), Blackheath (1.9 km south, 91.6% on time, 1.3% cancelled), Charlton (2.0 km east, 84.1% on time, 6.5% cancelled), Deptford (2.2 km west, 84.1% on time, 6.8% cancelled) and Lewisham (2.3 km south-west, 90.9% on time, 1.0% cancelled), which are the stations on its network closest to Maze Hill.
Within 30 km of here, GTR runs best at Beckenham Junction, 8.2 km south (98.1%), and worst at Kenley, 19.0 km south (66.9%).
The busiest GTR station within 30 km of Maze Hill is East Croydon, 13.7 km south-west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Maze Hill, GTR is the least punctual, at 82.5%.
For GTR, Maze Hill ranks 179th of 307 stations and is typical: 82.5% here against 82.9% across the network, a difference of 0.4 percentage points.
GTR at Maze Hill has not moved in one direction over three full railway years: 86.7% within three minutes in 2023-24, 83.6% in 2024-25 and 84.3% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,865 | 82.6% | 6.0% |
| Period 6 of 2026-27 | 1,655 | 80.0% | 5.0% |
| Period 5 of 2026-27 | 1,232 | 81.1% | 7.6% |
| Period 4 of 2026-27 | 1,616 | 80.3% | 5.0% |
| Period 3 of 2026-27 | 1,119 | 80.2% | 6.7% |
| Period 2 of 2026-27 | 1,594 | 82.8% | 4.3% |
| Period 1 of 2026-27 | 1,944 | 86.8% | 5.0% |
| Period 13 of 2025-26 | 1,998 | 85.3% | 2.8% |
| Period 12 of 2025-26 | 1,737 | 82.1% | 8.2% |
| Period 11 of 2025-26 | 1,797 | 83.4% | 8.7% |
| Period 10 of 2025-26 | 1,599 | 85.9% | 9.8% |
| Period 9 of 2025-26 | 1,837 | 80.5% | 10.7% |
| Period 8 of 2025-26 | 1,766 | 80.0% | 7.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Maze Hill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 34,516 | 90.8% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out