Maze Hill
MZHLondonManaged by Southeastern
How this station is performing
Maze Hill had 56,275 scheduled stops to Period 7 of 2026-27, about 155 a day. 87.7% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Maze Hill opened on 1 January 1873, 153 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Deptford is the oldest (1836) and Westcombe Park the newest (1879), with Maze Hill in between.
The nearest stations to Maze Hill are Westcombe Park (1.1 km east), Greenwich (1.4 km west), Blackheath (1.9 km south), Charlton (2.0 km east) and Deptford (2.2 km west). 123 stations lie within 10 km in all. Of the five, Westcombe Park is the most punctual at 88.2% and Deptford the least at 86.5%, with Maze Hill on 87.7%.
Maze Hill takes its name from an area of London called Maze Hill, and the station stands 0.2 km from its centre.
2 operators call at Maze Hill: Southeastern (90.8%, 61% of stops) and GTR (82.5%, 39% of stops). The operator you travel with matters: Southeastern reaches 90.8% within three minutes while GTR manages 82.5%, a gap of 8.3 percentage points.
1 of 3 stations of a similar size in London are more punctual than Maze Hill on 87.7%. The comparison group includes Greenwich (86.6%), Deptford (86.5%) and Belvedere (92.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 34,516 | 90.8% | 1.8% |
| GTR | 21,759 | 82.5% | 6.7% |
Operators with their own page for this station are linked to it.
Late train at Maze Hill? Delay Repay
These operators call at Maze Hill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,605 | 87.7% | 3.0% |
| Period 6 of 2026-27 | 4,300 | 87.3% | 2.4% |
| Period 5 of 2026-27 | 3,841 | 88.7% | 4.1% |
| Period 4 of 2026-27 | 4,224 | 87.1% | 3.2% |
| Period 3 of 2026-27 | 3,493 | 85.9% | 5.2% |
| Period 2 of 2026-27 | 4,130 | 87.9% | 3.1% |
| Period 1 of 2026-27 | 5,053 | 89.3% | 2.8% |
| Period 13 of 2025-26 | 5,008 | 88.1% | 2.0% |
| Period 12 of 2025-26 | 4,402 | 87.8% | 4.2% |
| Period 11 of 2025-26 | 4,460 | 89.1% | 4.4% |
| Period 10 of 2025-26 | 3,905 | 89.8% | 4.5% |
| Period 9 of 2025-26 | 4,426 | 85.6% | 5.2% |
| Period 8 of 2025-26 | 4,428 | 85.6% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out