ScotRail at Markinch
How this operator is doing here
ScotRail had 25,274 scheduled stops at Markinch in the 13 periods to Period 7 of 2026-27, 97% of the station's total. 80.2% of recorded arrivals came within three minutes and 1.1% of stops were cancelled.
ScotRail trains at Markinch also serve Glenrothes with Thornton (4.3 km south, 79.2% on time, 1.6% cancelled), Cameron Bridge (5.4 km east, 82.3% on time, 1.8% cancelled), Leven (8.0 km east, 83.4% on time, 1.8% cancelled), Ladybank (8.2 km north, 82.3% on time, 1.1% cancelled), Kirkcaldy (10.1 km south, 79.8% on time, 1.4% cancelled) and Cardenden (10.4 km south-west, 81.7% on time, 1.5% cancelled), which are the stations on its network closest to Markinch.
Within 30 km of here, ScotRail runs best at North Berwick, 29.5 km south-east (91.6%), and worst at Leuchars (For St. Andrews), 24.3 km north-east (76.5%).
The busiest ScotRail station within 30 km of Markinch is Edinburgh, 27.9 km south, with about 614 scheduled stops a day.
Of the 2 operators with enough records at Markinch, ScotRail is the most punctual, at 80.2%.
For ScotRail, Markinch is the 268th best of 312 ranked stations. Its 80.2% here is 7.7 percentage points below the 87.9% across the whole network.
Over three full railway years ScotRail at Markinch has improved each time, from 78.5% within three minutes in 2023-24 to 80.1% in 2024-25 and 82.4% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,923 | 73.4% | 1.1% |
| Period 6 of 2026-27 | 1,931 | 80.6% | 1.2% |
| Period 5 of 2026-27 | 1,934 | 76.5% | 1.8% |
| Period 4 of 2026-27 | 1,932 | 77.4% | 1.1% |
| Period 3 of 2026-27 | 1,930 | 82.1% | 0.9% |
| Period 2 of 2026-27 | 1,926 | 82.7% | 0.6% |
| Period 1 of 2026-27 | 2,230 | 82.9% | 0.9% |
| Period 13 of 2025-26 | 2,099 | 85.1% | 0.5% |
| Period 12 of 2025-26 | 1,924 | 80.3% | 0.6% |
| Period 11 of 2025-26 | 1,957 | 85.7% | 1.9% |
| Period 10 of 2025-26 | 1,681 | 77.9% | 1.1% |
| Period 9 of 2025-26 | 1,904 | 76.9% | 2.6% |
| Period 8 of 2025-26 | 1,903 | 79.4% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Markinch
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 692 | 47.1% | 13.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out