Markinch
MNCScotlandManaged by ScotRail
How this station is performing
Markinch had 25,966 scheduled stops to Period 7 of 2026-27, about 71 a day. 79.4% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Markinch opened on 20 September 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Markinch is the oldest; the next oldest, Ladybank, dates from 1847.
The nearest stations to Markinch are Glenrothes with Thornton (4.3 km south), Cameron Bridge (5.4 km east), Leven (8.0 km east), Ladybank (8.2 km north) and Kirkcaldy (10.1 km south). 4 stations lie within 10 km in all. Of the five, Leven is the most punctual at 83.4% and Kirkcaldy the least at 78.2%, with Markinch on 79.4%.
Markinch takes its name from a town called Markinch, home to about 2,420 people, and the station stands 0.4 km from its centre.
2 operators call at Markinch: ScotRail (80.2%, 97% of stops) and CrossCountry (47.1%, 3% of stops). The operator you travel with matters: ScotRail reaches 80.2% within three minutes while CrossCountry manages 47.1%, a gap of 33.1 percentage points.
Compared with 3 stations of a similar size in Scotland, Markinch is the least punctual, at 79.4%. All of them are ahead, including Hillington West (96.3%), Kilmarnock (91.6%) and Armadale (West Lothian) (89.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 25,274 | 80.2% | 1.1% |
| CrossCountry | 692 | 47.1% | 13.6% |
Operators with their own page for this station are linked to it.
Late train at Markinch? Delay Repay
These operators call at Markinch and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,963 | 73.1% | 1.2% |
| Period 6 of 2026-27 | 1,987 | 79.9% | 1.7% |
| Period 5 of 2026-27 | 1,990 | 75.5% | 1.9% |
| Period 4 of 2026-27 | 1,988 | 76.5% | 1.4% |
| Period 3 of 2026-27 | 1,980 | 81.4% | 1.3% |
| Period 2 of 2026-27 | 1,982 | 82.2% | 1.2% |
| Period 1 of 2026-27 | 2,294 | 82.4% | 1.7% |
| Period 13 of 2025-26 | 2,161 | 84.1% | 0.6% |
| Period 12 of 2025-26 | 1,980 | 79.4% | 0.8% |
| Period 11 of 2025-26 | 1,995 | 85.1% | 2.2% |
| Period 10 of 2025-26 | 1,729 | 77.2% | 1.5% |
| Period 9 of 2025-26 | 1,960 | 75.8% | 2.8% |
| Period 8 of 2025-26 | 1,957 | 78.5% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hillington West | 25,883 | 96.3% | 1.2% |
| Kilmarnock | 26,073 | 91.6% | 1.8% |
| Armadale (West Lothian) | 25,829 | 89.2% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out