Malvern Link
MVLWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Malvern Link had 22,965 scheduled stops to Period 7 of 2026-27, about 63 a day. 73.7% of recorded arrivals were within three minutes of the timetable and 5.2% of scheduled stops were cancelled.
Malvern Link opened on 25 July 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Worcester Shrub Hill is the oldest (1850) and Worcestershire Parkway the newest (2020), with Malvern Link in between.
The nearest stations to Malvern Link are Great Malvern (1.9 km south), Colwall (5.7 km south-west), Worcester Foregate Street (10.3 km north-east), Worcester Shrub Hill (10.8 km north-east) and Worcestershire Parkway (11.4 km east). 2 stations lie within 10 km in all. Of the five, Worcester Foregate Street is the most punctual at 76.0% and Worcestershire Parkway the least at 61.9%, with Malvern Link on 73.7%.
Malvern Link takes its name from a settlement called Malvern Link, home to about 6,155 people, and the station stands 0.2 km from its centre.
2 operators call at Malvern Link: West Midlands Railway (76.9%, 57% of stops) and Great Western Railway (68.7%, 43% of stops). The operator you travel with matters: West Midlands Railway reaches 76.9% within three minutes while Great Western Railway manages 68.7%, a gap of 8.2 percentage points.
2 of 3 stations of a similar size in West Midlands are more punctual than Malvern Link on 73.7%. The comparison group includes Great Malvern (70.8%), Stechford (82.9%) and Lea Hall (82.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 13,036 | 76.9% | 2.3% |
| Great Western Railway | 9,929 | 68.7% | 9.1% |
Operators with their own page for this station are linked to it.
Late train at Malvern Link? Delay Repay
These operators call at Malvern Link and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,739 | 71.6% | 4.8% |
| Period 6 of 2026-27 | 1,780 | 71.0% | 5.7% |
| Period 5 of 2026-27 | 1,775 | 72.5% | 8.3% |
| Period 4 of 2026-27 | 1,690 | 71.2% | 7.4% |
| Period 3 of 2026-27 | 1,778 | 73.3% | 7.3% |
| Period 2 of 2026-27 | 1,702 | 73.1% | 4.5% |
| Period 1 of 2026-27 | 2,049 | 75.4% | 3.5% |
| Period 13 of 2025-26 | 1,956 | 80.0% | 3.0% |
| Period 12 of 2025-26 | 1,748 | 82.9% | 2.0% |
| Period 11 of 2025-26 | 1,739 | 81.3% | 6.5% |
| Period 10 of 2025-26 | 1,619 | 70.5% | 5.6% |
| Period 9 of 2025-26 | 1,736 | 63.9% | 4.3% |
| Period 8 of 2025-26 | 1,654 | 68.5% | 5.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Malvern | 23,014 | 70.8% | 5.8% |
| Stechford | 22,885 | 82.9% | 2.4% |
| Lea Hall | 23,142 | 82.6% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out