How this operator is doing here
West Midlands Railway had 13,036 scheduled stops at Malvern Link in the 13 periods to Period 7 of 2026-27, 57% of the station's total. 76.9% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
West Midlands Railway trains at Malvern Link also serve Great Malvern (1.9 km south, 75.6% on time, 2.5% cancelled), Colwall (5.7 km south-west, 71.0% on time, 2.8% cancelled), Worcester Foregate Street (10.3 km north-east, 80.9% on time, 3.9% cancelled), Worcester Shrub Hill (10.8 km north-east, 81.7% on time, 4.5% cancelled), Ledbury (11.5 km south-west, 73.1% on time, 3.2% cancelled) and Droitwich Spa (19.3 km north-east, 81.6% on time, 3.3% cancelled), which are the stations on its network closest to Malvern Link.
Within 30 km of here, West Midlands Railway runs best at Kidderminster, 29.3 km north (88.2%), and worst at Colwall, 5.7 km south-west (71.0%).
The busiest West Midlands Railway station within 30 km of Malvern Link is Kidderminster, 29.3 km north, with about 111 scheduled stops a day.
West Midlands Railway at Malvern Link has slipped a little, from 81.3% within three minutes in the previous 13 periods to 76.9% in the latest 13, a fall of 4.4 percentage points. Cancellations fell to 2.3% of scheduled stops from 3.9%, which is 1.6 percentage points fewer.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,012 | 73.5% | 2.4% |
| Period 6 of 2026-27 | 1,012 | 73.2% | 0.9% |
| Period 5 of 2026-27 | 1,010 | 76.4% | 1.3% |
| Period 4 of 2026-27 | 925 | 74.9% | 2.7% |
| Period 3 of 2026-27 | 1,012 | 76.7% | 2.2% |
| Period 2 of 2026-27 | 934 | 77.3% | 3.3% |
| Period 1 of 2026-27 | 1,168 | 78.9% | 1.4% |
| Period 13 of 2025-26 | 1,109 | 83.2% | 2.0% |
| Period 12 of 2025-26 | 991 | 84.8% | 1.9% |
| Period 11 of 2025-26 | 975 | 84.0% | 4.4% |
| Period 10 of 2025-26 | 916 | 78.8% | 1.6% |
| Period 9 of 2025-26 | 972 | 64.6% | 1.6% |
| Period 8 of 2025-26 | 1,000 | 71.4% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Malvern Link
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 9,929 | 68.7% | 9.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out