Great Malvern
GMVWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Great Malvern had 23,014 scheduled stops to Period 7 of 2026-27, about 63 a day. 70.8% of recorded arrivals were within three minutes of the timetable and 5.8% of scheduled stops were cancelled.
Great Malvern opened on 25 May 1860, 166 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Malvern Link is the oldest (1859) and Worcestershire Parkway the newest (2020), with Great Malvern in between.
The nearest stations to Great Malvern are Malvern Link (1.9 km north), Colwall (4.2 km south-west), Ledbury (10.2 km south-west), Worcester Foregate Street (11.7 km north-east) and Worcestershire Parkway (12.0 km north-east). 2 stations lie within 10 km in all. Of the five, Worcester Foregate Street is the most punctual at 76.0% and Worcestershire Parkway the least at 61.9%, with Great Malvern on 70.8%.
Great Malvern takes its name from a market town called Great Malvern, and the station stands 0.8 km from its centre.
2 operators call at Great Malvern: West Midlands Railway (75.6%, 57% of stops) and Great Western Railway (64.0%, 43% of stops). The operator you travel with matters: West Midlands Railway reaches 75.6% within three minutes while Great Western Railway manages 64.0%, a gap of 11.6 percentage points.
Compared with 3 stations of a similar size in West Midlands, Great Malvern is the least punctual, at 70.8%. All of them are ahead, including Malvern Link (73.7%), Lea Hall (82.6%) and Stechford (82.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 13,085 | 75.6% | 2.5% |
| Great Western Railway | 9,929 | 64.0% | 10.1% |
Operators with their own page for this station are linked to it.
Late train at Great Malvern? Delay Repay
These operators call at Great Malvern and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,743 | 68.8% | 5.2% |
| Period 6 of 2026-27 | 1,784 | 69.4% | 6.3% |
| Period 5 of 2026-27 | 1,779 | 70.4% | 9.2% |
| Period 4 of 2026-27 | 1,693 | 68.5% | 8.2% |
| Period 3 of 2026-27 | 1,782 | 71.3% | 7.9% |
| Period 2 of 2026-27 | 1,705 | 71.7% | 4.8% |
| Period 1 of 2026-27 | 2,054 | 73.8% | 4.2% |
| Period 13 of 2025-26 | 1,960 | 78.4% | 3.4% |
| Period 12 of 2025-26 | 1,752 | 79.1% | 2.2% |
| Period 11 of 2025-26 | 1,743 | 79.0% | 6.7% |
| Period 10 of 2025-26 | 1,623 | 68.9% | 6.3% |
| Period 9 of 2025-26 | 1,740 | 54.9% | 5.1% |
| Period 8 of 2025-26 | 1,656 | 63.8% | 6.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Malvern Link | 22,965 | 73.7% | 5.2% |
| Lea Hall | 23,142 | 82.6% | 2.4% |
| Stechford | 22,885 | 82.9% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out