Stechford
SCFWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Stechford had 22,885 scheduled stops to Period 7 of 2026-27, about 63 a day. 82.9% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
The nearest stations to Stechford are Lea Hall (1.7 km east), Adderley Park (3.0 km west), Tyseley (3.9 km south-west), Acocks Green (4.0 km south) and Small Heath (4.0 km south-west). 34 stations lie within 10 km in all. Of the five, Tyseley is the most punctual at 92.4% and Lea Hall the least at 82.6%, with Stechford on 82.9%.
Stechford takes its name from a suburb called Stechford, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Stechford was Period 9 of 2024-25, at 76.1%, some time before the latest year. The strongest was Period 12 of 2024-25, at 90.2%, and the two are 14.1 percentage points apart. Cancellations peaked at 5.3% of scheduled stops in Period 4 of 2026-27, against 2.4% over the latest 13 periods.
The time of year matters a great deal for Stechford. Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 77.0%, while period 12 (February) is the strongest at 87.4%, a spread of 10.4 percentage points.
Compared with 3 stations of a similar size in West Midlands, Stechford is the most punctual, at 82.9%. The comparison group includes Malvern Link (73.7%), Great Malvern (70.8%) and Lea Hall (82.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 22,885 | 82.9% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Stechford? Delay Repay
These operators call at Stechford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,880 | 79.7% | 2.5% |
| Period 6 of 2026-27 | 1,880 | 77.7% | 1.7% |
| Period 5 of 2026-27 | 1,452 | 84.4% | 3.6% |
| Period 4 of 2026-27 | 1,238 | 81.7% | 5.3% |
| Period 3 of 2026-27 | 1,451 | 83.8% | 1.9% |
| Period 2 of 2026-27 | 1,675 | 85.3% | 2.4% |
| Period 1 of 2026-27 | 2,177 | 86.8% | 1.5% |
| Period 13 of 2025-26 | 2,058 | 85.5% | 1.1% |
| Period 12 of 2025-26 | 1,878 | 86.0% | 0.8% |
| Period 11 of 2025-26 | 1,852 | 85.6% | 4.8% |
| Period 10 of 2025-26 | 1,714 | 83.3% | 1.9% |
| Period 9 of 2025-26 | 1,890 | 77.0% | 2.3% |
| Period 8 of 2025-26 | 1,740 | 80.5% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Malvern Link | 22,965 | 73.7% | 5.2% |
| Great Malvern | 23,014 | 70.8% | 5.8% |
| Lea Hall | 23,142 | 82.6% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out