Mallaig
MLGScotlandManaged by ScotRail
How this station is performing
Mallaig had 2,826 scheduled stops to Period 7 of 2026-27, about 8 a day. 86.0% of recorded arrivals were within three minutes of the timetable and 0.8% of scheduled stops were cancelled.
Mallaig opened on 1 April 1901, 125 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Mallaig is the oldest; the next oldest, Morar, dates from 1901.
The nearest stations to Mallaig are Morar (4.1 km south), Arisaig (10.3 km south), Beasdale (12.4 km south), Lochailort (17.2 km south-east) and Glenfinnan (27.4 km south-east). 1 stations lie within 10 km in all. Of the five, Arisaig is the most punctual at 88.8% and Glenfinnan the least at 84.9%, with Mallaig on 86.0%.
Mallaig takes its name from a town called Mallaig, home to about 806 people, and the station stands 0.1 km from its centre.
For Mallaig, the weakest four-week period in the data is a recent one: Period 4 of 2026-27, when only 73.5% of stops arrived within three minutes of the timetable. The strongest was Period 11 of 2024-25, at 92.3%, which is 18.8 percentage points higher. Cancellations peaked at 8.9% of scheduled stops in Period 10 of 2023-24, against 0.8% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than Mallaig on 86.0%. The comparison group includes Arisaig (88.8%), Banavie (83.3%) and Corpach (85.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 2,826 | 86.0% | 0.8% |
Operators with their own page for this station are linked to it.
Late train at Mallaig? Delay Repay
These operators call at Mallaig and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 216 | 92.1% | 0.0% |
| Period 6 of 2026-27 | 216 | 85.2% | 0.0% |
| Period 5 of 2026-27 | 216 | 83.3% | 0.0% |
| Period 4 of 2026-27 | 216 | 73.5% | 0.5% |
| Period 3 of 2026-27 | 216 | 82.1% | 1.9% |
| Period 2 of 2026-27 | 216 | 82.4% | 0.0% |
| Period 1 of 2026-27 | 248 | 85.9% | 0.0% |
| Period 13 of 2025-26 | 238 | 87.0% | 0.0% |
| Period 12 of 2025-26 | 216 | 91.1% | 1.4% |
| Period 11 of 2025-26 | 216 | 90.0% | 2.3% |
| Period 10 of 2025-26 | 180 | 88.5% | 3.3% |
| Period 9 of 2025-26 | 216 | 90.1% | 1.9% |
| Period 8 of 2025-26 | 216 | 87.5% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out