Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Corpach

CPAScotlandManaged by ScotRail

On time, last 13 periods85.0%Great Britain: 83.6%
Cancelled0.8%Great Britain: 3.2%
Stops a day8Scheduled, on average
Punctuality rank1067th of 2,374Among ranked stations

How this station is performing

Corpach has usable figures for 9 of the last 13 four-week periods to Period 7 of 2026-27, covering 2,815 scheduled stops, about 8 a day. In those periods 85.0% of stops arrived within three minutes of the timetable and 0.8% of scheduled stops were cancelled.

Corpach opened on 1 April 1901, 125 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Fort William is the oldest (1894) and Loch Eil Outward Bound the newest (1985), with Corpach in between.

The nearest stations to Corpach are Banavie (1.6 km east), Fort William (2.7 km south), Loch Eil Outward Bound (4.6 km west), Locheilside (10.4 km west) and Spean Bridge (13.2 km north-east). 3 stations lie within 10 km in all. At 85.0%, Corpach is more punctual than every one of them; the best of the five, Loch Eil Outward Bound, manages 83.5%.

Corpach takes its name from a Village called Corpach, and the station stands 0.1 km from its centre.

1 of 3 stations of a similar size in Scotland are more punctual than Corpach on 85.0%. The comparison group includes Arisaig (88.8%), Banavie (83.3%) and Glenfinnan (84.9%).

Period by period

75%80%85%90%2023-242024-252025-262026-27Period 8 of 2025-26: 88.9%Period 9 of 2025-26: 84.7%Period 13 of 2025-26: 86.5%Period 1 of 2026-27: 88.4%Period 2 of 2026-27: 81.2%Period 3 of 2026-27: 82.4%Period 4 of 2026-27: 83.1%Period 5 of 2026-27: 85.9%Period 6 of 2026-27: 84.1%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 0.0%Period 2 of 2023-24: 0.0%Period 3 of 2023-24: 0.0%Period 4 of 2023-24: 0.0%Period 5 of 2023-24: 0.5%Period 6 of 2023-24: 0.0%Period 7 of 2023-24: 0.0%Period 8 of 2023-24: 1.0%Period 9 of 2023-24: 1.4%Period 10 of 2023-24: 8.9%Period 11 of 2023-24: 3.0%Period 12 of 2023-24: 2.3%Period 13 of 2023-24: 1.3%Period 1 of 2024-25: 2.9%Period 2 of 2024-25: 0.0%Period 3 of 2024-25: 0.0%Period 4 of 2024-25: 1.1%Period 5 of 2024-25: 0.5%Period 6 of 2024-25: 0.0%Period 7 of 2024-25: 0.0%Period 8 of 2024-25: 0.0%Period 9 of 2024-25: 2.9%Period 10 of 2024-25: 2.6%Period 11 of 2024-25: 2.0%Period 12 of 2024-25: 1.0%Period 13 of 2024-25: 0.5%Period 1 of 2025-26: 1.0%Period 2 of 2025-26: 0.0%Period 3 of 2025-26: 0.9%Period 4 of 2025-26: 1.4%Period 5 of 2025-26: 0.0%Period 6 of 2025-26: 0.0%Period 7 of 2025-26: 1.5%Period 8 of 2025-26: 0.0%Period 9 of 2025-26: 1.9%Period 10 of 2025-26: 3.3%Period 11 of 2025-26: 2.3%Period 12 of 2025-26: 1.4%Period 13 of 2025-26: 0.0%Period 1 of 2026-27: 0.0%Period 2 of 2026-27: 0.0%Period 3 of 2026-27: 0.9%Period 4 of 2026-27: 0.9%Period 5 of 2026-27: 0.0%Period 6 of 2026-27: 0.0%Period 7 of 2026-27: 0.0%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail2,81585.0%0.8%

Operators with their own page for this station are linked to it.

Late train at Corpach? Delay Repay

These operators call at Corpach and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-27210–0.0%
Period 6 of 2026-2721684.1%0.0%
Period 5 of 2026-2721685.9%0.0%
Period 4 of 2026-2721183.1%0.9%
Period 3 of 2026-2721682.4%0.9%
Period 2 of 2026-2721681.2%0.0%
Period 1 of 2026-2724888.4%0.0%
Period 13 of 2025-2623886.5%0.0%
Period 12 of 2025-26216–1.4%
Period 11 of 2025-26216–2.3%
Period 10 of 2025-26180–3.3%
Period 9 of 2025-2621684.7%1.9%
Period 8 of 2025-2621688.9%0.0%

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Arisaig2,81588.8%0.8%
Banavie2,81583.3%0.8%
Glenfinnan2,81584.9%0.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out