Maidstone West
MDWSouth EastManaged by Southeastern
How this station is performing
Maidstone West had 25,158 scheduled stops to Period 7 of 2026-27, about 69 a day. 94.8% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Maidstone West opened on 25 September 1844, 182 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Maidstone West is the oldest; the next oldest, East Farleigh, dates from 1844.
The nearest stations to Maidstone West are Maidstone Barracks (0.8 km north), Maidstone East (0.9 km north), East Farleigh (2.7 km south-west), Barming (3.0 km north-west) and Bearsted (4.4 km east). 13 stations lie within 10 km in all. Of the five, Maidstone Barracks is the most punctual at 95.2% and Barming the least at 80.9%, with Maidstone West on 94.8%.
Maidstone West is named after Maidstone, a county town, home to about 109,490 people, but the station stands 1.0 km from its centre.
In South East, Maidstone West ranks 24th of 409 ranked stations. Its 94.8% is 13.6 percentage points better than the area median of 81.2%.
Compared with 3 stations of a similar size in South East, Maidstone West is the most punctual, at 94.8%. The comparison group includes Upper Halliford (87.1%), Wanborough (91.9%) and Epsom Downs (92.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 25,158 | 94.8% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Maidstone West? Delay Repay
These operators call at Maidstone West and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,969 | 94.5% | 1.1% |
| Period 6 of 2026-27 | 1,900 | 95.1% | 1.4% |
| Period 5 of 2026-27 | 1,874 | 95.2% | 2.8% |
| Period 4 of 2026-27 | 1,968 | 96.1% | 1.4% |
| Period 3 of 2026-27 | 1,908 | 93.0% | 1.8% |
| Period 2 of 2026-27 | 1,890 | 94.9% | 1.4% |
| Period 1 of 2026-27 | 2,217 | 96.9% | 0.6% |
| Period 13 of 2025-26 | 2,099 | 95.7% | 2.4% |
| Period 12 of 2025-26 | 1,909 | 95.4% | 0.7% |
| Period 11 of 2025-26 | 1,971 | 95.6% | 1.4% |
| Period 10 of 2025-26 | 1,610 | 94.7% | 0.8% |
| Period 9 of 2025-26 | 1,875 | 90.4% | 2.7% |
| Period 8 of 2025-26 | 1,968 | 93.8% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Upper Halliford | 25,124 | 87.1% | 4.8% |
| Wanborough | 25,103 | 91.9% | 2.6% |
| Epsom Downs | 25,097 | 92.6% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out