Wanborough
WANSouth EastManaged by South Western Railway
How this station is performing
Wanborough had 25,103 scheduled stops to Period 7 of 2026-27, about 69 a day. 91.9% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Wanborough opened on 1 September 1891, 135 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Wanborough is the newest; the oldest, Guildford, opened in 1845.
The nearest stations to Wanborough are Ash (3.2 km west), Ash Vale (4.9 km north-west), North Camp (5.6 km north-west), Guildford (6.1 km east) and Aldershot (6.4 km west). 16 stations lie within 10 km in all. At 91.9%, Wanborough is more punctual than every one of them; the best of the five, Ash Vale, manages 91.2%.
Wanborough is one of 2 stations named after a Village called Wanborough, home to about 360 people; this one stands 1.5 km from its centre.
2 operators call at Wanborough: South Western Railway (92.7%, 92% of stops) and Great Western Railway (82.4%, 8% of stops). The operator you travel with matters: South Western Railway reaches 92.7% within three minutes while Great Western Railway manages 82.4%, a gap of 10.3 percentage points.
1 of 3 stations of a similar size in South East are more punctual than Wanborough on 91.9%. The comparison group includes Epsom Downs (92.6%), Upper Halliford (87.1%) and Bramley (Hampshire) (86.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 23,128 | 92.7% | 2.2% |
| Great Western Railway | 1,975 | 82.4% | 6.6% |
Operators with their own page for this station are linked to it.
Late train at Wanborough? Delay Repay
These operators call at Wanborough and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,802 | 90.4% | 2.9% |
| Period 6 of 2026-27 | 1,966 | 89.8% | 2.3% |
| Period 5 of 2026-27 | 1,964 | 90.3% | 3.7% |
| Period 4 of 2026-27 | 1,933 | 91.7% | 2.1% |
| Period 3 of 2026-27 | 1,843 | 93.1% | 5.4% |
| Period 2 of 2026-27 | 1,964 | 93.8% | 4.0% |
| Period 1 of 2026-27 | 2,244 | 94.0% | 2.5% |
| Period 13 of 2025-26 | 2,127 | 94.5% | 0.9% |
| Period 12 of 2025-26 | 1,882 | 95.8% | 1.4% |
| Period 11 of 2025-26 | 1,965 | 95.3% | 1.3% |
| Period 10 of 2025-26 | 1,731 | 91.6% | 2.5% |
| Period 9 of 2025-26 | 1,771 | 86.6% | 1.2% |
| Period 8 of 2025-26 | 1,911 | 86.4% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Epsom Downs | 25,097 | 92.6% | 3.1% |
| Upper Halliford | 25,124 | 87.1% | 4.8% |
| Bramley (Hampshire) | 25,061 | 86.5% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out