Epsom Downs
EPDSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Epsom Downs had 25,097 scheduled stops to Period 7 of 2026-27, about 69 a day. 92.6% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Epsom Downs opened on 22 May 1865. It was moved to the site it uses now on 13 February 1989. Among the 5 stations nearest to it with a known opening date, Ewell East is the oldest (1847) and Tattenham Corner the newest (1901), with Epsom Downs in between.
The nearest stations to Epsom Downs are Tattenham Corner (1.7 km south), Banstead (1.8 km east), Ewell East (2.4 km north), Epsom (Surrey) (2.4 km north-west) and Ewell West (3.2 km north-west). 49 stations lie within 10 km in all. At 92.6%, Epsom Downs is more punctual than every one of them; the best of the five, Ewell East, manages 91.7%.
Epsom Downs is named after Epsom, a town, home to about 31,489 people, but the station stands 2.4 km from its centre.
In South East, Epsom Downs ranks 35th of 409 ranked stations. Its 92.6% is 11.4 percentage points better than the area median of 81.2%.
Compared with 3 stations of a similar size in South East, Epsom Downs is the most punctual, at 92.6%. The comparison group includes Wanborough (91.9%), Upper Halliford (87.1%) and Bramley (Hampshire) (86.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,097 | 92.6% | 3.1% |
Operators with their own page for this station are linked to it.
Late train at Epsom Downs? Delay Repay
These operators call at Epsom Downs and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,901 | 94.2% | 5.3% |
| Period 6 of 2026-27 | 1,860 | 92.9% | 1.2% |
| Period 5 of 2026-27 | 1,946 | 90.4% | 4.5% |
| Period 4 of 2026-27 | 1,836 | 92.3% | 2.7% |
| Period 3 of 2026-27 | 1,920 | 94.6% | 2.1% |
| Period 2 of 2026-27 | 1,950 | 93.4% | 3.1% |
| Period 1 of 2026-27 | 2,239 | 95.2% | 2.2% |
| Period 13 of 2025-26 | 2,065 | 92.5% | 4.4% |
| Period 12 of 2025-26 | 1,954 | 91.1% | 2.0% |
| Period 11 of 2025-26 | 1,952 | 90.9% | 2.1% |
| Period 10 of 2025-26 | 1,732 | 90.9% | 2.8% |
| Period 9 of 2025-26 | 1,898 | 92.6% | 4.1% |
| Period 8 of 2025-26 | 1,844 | 92.9% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Wanborough | 25,103 | 91.9% | 2.6% |
| Upper Halliford | 25,124 | 87.1% | 4.8% |
| Bramley (Hampshire) | 25,061 | 86.5% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out