Avanti at Macclesfield
How this operator is doing here
Avanti had 12,720 scheduled stops at Macclesfield in the 13 periods to Period 7 of 2026-27, 28% of the station's total. 49.6% of recorded arrivals came within three minutes and 5.2% of stops were cancelled.
Avanti trains at Macclesfield also serve Wilmslow (10.3 km north-west, 54.8% on time, 5.0% cancelled), Stockport (16.5 km north, 54.2% on time, 6.0% cancelled), Manchester Piccadilly (25.3 km north, 52.8% on time, 5.8% cancelled), Crewe (28.1 km south-west, 55.1% on time, 4.7% cancelled), Stoke-on-Trent (28.2 km south, 49.6% on time, 7.2% cancelled) and Hartford (Cheshire) (28.8 km west, – on time, – cancelled), which are the stations on its network closest to Macclesfield.
Within 30 km of here, Avanti runs best at Crewe, 28.1 km south-west (55.1%), and worst at Stoke-on-Trent, 28.2 km south (49.6%).
The busiest Avanti station within 30 km of Macclesfield is Crewe, 28.1 km south-west, with about 130 scheduled stops a day.
Of the 3 operators with enough records at Macclesfield, Avanti is the least punctual, at 49.6%.
For Avanti, Macclesfield is the 33rd best of 42 ranked stations. Its 49.6% here is 5.6 percentage points below the 55.2% across the whole network.
Avanti at Macclesfield has not moved in one direction over three full railway years: 53.0% within three minutes in 2023-24, 48.1% in 2024-25 and 51.0% in 2025-26.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 983 | 52.0% | 3.7% |
| Period 6 of 2026-27 | 967 | 46.0% | 1.2% |
| Period 5 of 2026-27 | 887 | 40.9% | 7.4% |
| Period 4 of 2026-27 | 960 | 38.6% | 10.8% |
| Period 3 of 2026-27 | 965 | 46.8% | 4.1% |
| Period 2 of 2026-27 | 982 | 49.1% | 5.3% |
| Period 1 of 2026-27 | 1,090 | 56.9% | 4.5% |
| Period 13 of 2025-26 | 1,090 | 61.0% | 4.8% |
| Period 12 of 2025-26 | 974 | 56.8% | 3.3% |
| Period 11 of 2025-26 | 980 | 55.7% | 6.3% |
| Period 10 of 2025-26 | 871 | 54.4% | 4.8% |
| Period 9 of 2025-26 | 984 | 38.1% | 8.5% |
| Period 8 of 2025-26 | 987 | 44.5% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Macclesfield
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 20,060 | 57.8% | 6.8% |
| Northern | 12,118 | 79.4% | 2.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out